The entire decisional simulation cycle of socioIproductive systems obeys the three research levels: analysis, designing and management of the simulation activity. The analysis represents the research process of the system’s component with the purpose of highlighting the following issues: the role of the system within the economic enterprise system; their horizontal and vertical interaction within the organisational structure; the status and decision variables – controllable or uncontrollable, which determines the running of the system; the identification of atypical behaviours and factors which influence the good running of the system and which cannot be included in the category of disruptive factors. The management of the simulation activity represents the whole set of planned procedures in view of grouping structures, phenomena and processes analysed and/or designed. By dint of this management a concise and clear formulation results for: the object of the simulation; the purposes pursued; ways of achieving the simulation; preserving, maintaining and updating the essential information achieved as a result of the simulation.
References
[1] Badescu, A., Cristea, R. (2007), Group Decision Models Using Fuzzy
Sets. Economic Computation and Economic Cybernetics Studies and
Research, issue 1N2, ASE Publishing House, Bucharest;
[2] BarJYam, Y. (2001), Introducing Complex Systems, New England
Complex Systems Institute, Cambridge, MA ;
[3] Bertalanffy, L. (1973 ), General System Theory. Braziller Publishing
House, New York ;
[4] Brillet, J.L. (1994 ), Modelisation Econometrique, Principes et
Tehniques , Economica, Paris ;
[5] Chaitin ,G.J. (2003), Algorithmic Information Theory. Third Printing ,
Cambridge University Press ;
[6] Colell, A., Whinston, M. (1995), Microeconomic Theory, Oxford
University Press;.
[7] Druker, P. (1992), Managing for the Future . Truman Talley Books, New
York ;
[8] Forrester, J.W. (1979), Principiile sistemelor. Teorie şi autoinstruire