Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 48 No. 3 (2014)

Personnel Evaluation and Selection by Multicriteria Decision Making Method

Submitted
October 24, 2026

Abstract

Personnel evaluation is a multicriteria decision making problem that can significantly affect the future caracteristics and the performance of an organization . The aim of this paper is to demonstrate the implementation of an integrated approach that employs AHP and PROMETHEE together for selecting the most suitable personnel from existing organization manpower in process of its reorganization and downsizing. The essence of the problem is how to minimize subjectivism of decision maker(s), that unfortun ately, dominates in this process in Serbia. The related problem includes a Serbian company`s department with five employers that has to be reorganized with reduction of employees on three. The AHP is used to analyze the structure of the personnel selection problem and to determine the criteria weights, and PROMETHEE method is used to obtain the final ranking. The results have shown that the proposed integrated method can be successfully used in solving managerial problems.

References

  1. [1] Afshari, A.R., Mojahed, M., Yusuff, R.M., Hong, T.S., Ismail, M.Y. (2010),
  2. Personnel Selection Using ELECTRE; Journal of Applied Sciences, vol. 10 (23),
  3. page 3068-3075;
  4. [2] Albadvi, A., Chaharsooghi, S.K., Esfahanipour, A. (2007), Decision Making
  5. in Stock Trading: An A pplication of PROMETHEE ; European Journal of
  6. Operational Research, vol. 177 (2), page 673-683;
  7. [3] Anand, G., Kodali, R. (2008) , Selection of Lean Manufacturing Systems
  8. Using the PROMETHEE ; Journal of Modeling in Management, vol. 3 (1), page
  9. 40-70;
  10. Personnel Evaluation and Selection by Multicriteria Decision Making Method
  11. __________________________________________________________________
  12. [4] Bowen, D., Gilliland, S.W., Folger, R. (1999) , HRM and Service Fairness:
  13. How Being Fair with Employees Spills over to C ustomers; Organizational
  14. Dynamics (Winter), page 7–23;
  15. [5] Bozdag, C. E., Kahrama n, C., Ruan, D. (2003) , Fuzzy Group Decision -
  16. making for Selection among Computer Integrated Manufacturing S ystems;
  17. Computers in Industry, vol. 51, page 13–29;
  18. [6] Brans, J.P., Mareschal, B., Vincke, P.H. (1984) , PROMETHEE: A New
  19. Family of Outranking Methods in Multi-criteria Analysis; Operational Research,
  20. page 477-490;
  21. [7] Brans, J.P. (1982) , L’ingénièrie de la décision; Elaboration d’instruments
  22. d’aide à la décision. La méthode PROMETHEE ; Nadeau, R., Landry, M. (Eds.),
  23. L’aide à la décision: Nature, Instru ments et Perspectives d’Avenir: Presses de
  24. l’Université Laval: Québec: Canada, page 183–213;
  25. [8] Brans, J.P., Vincke, P.H. (1985) , A Preference Ranking Organization
  26. Method: The PROMETHEE M ethod for MCDM ; Management Science, vol. 31
  27. (6), page 647-656;
  28. [9] Brans, J.P., Mareschal, B. (1994) , The PROMCALC and GAIA Decision
  29. Support System for MCDA; Decision Support System, vol. 12, page 297-310;
  30. [10] Bufardi, A., Kiritsis, G.R.D., Hirouchakis, P. (2004) , Multicriteria
  31. Decision-aid Approach for Product E nd-of-life Alternative S election;
  32. International Journal of Production Research, vol. 42, page 3139–3157;
  33. [11] Cannavacciuolo, A., Capaldo, G., Ventre, A., Zollo, G. (1994), Linking the
  34. Fuzzy Set Theory to Organizational Routines: A Study in Personnel E valuation
  35. in a Large C ompany; In: R. Marks (Ed.), Fuzzy Logic and Applications , IEEE
  36. Technical Activities Board, page 515–520;
  37. [12] Golec, A.,Kahya, E. (2007) , A F uzzy Model for Competency -based
  38. Employee Evaluation and S election; Computers & Industrial Engineering, vol.
  39. 52, page 143-161;
  40. [13] Iwamura, K., Lin, B. (1998) , Chance Constrained Integer Programming
  41. Models for Capital Budgeting E nvironments; Journal of Operational Research
  42. Society, vol. 46, page 854–860;
  43. [14] Kahraman, C., Ruan, D., Dogan, I. (2003) , Fuzzy Group Decision-making
  44. for Facility Location Selection; Information Sciences, vol. 157, page 135–153;
  45. [15] Kulik, C., Roberson, L., Perry, E. (2007) , The Multiple-category Problem:
  46. Category Activation and Inhibition in the Hiring P rocess; Acad. Manage. Rev.,
  47. vol. 32, page 529-548;
  48. [16] Lai, Y.J. (1995), IMOST: Interactive Multiple Objective System Technique;
  49. Journal of Operational Research Society, vol. 46, page 958–976;
  50. [17] Laing, G., Wang, M. (1992), Personnel Placement in a Fuzzy Environment;
  51. Computers Operations Research, vol. 19, page 107–121;
  52. Dejan Bogdanovic, Slavica Miletic
  53. ____________________________________________________________
  54. [18] Lee, W.B., Lau, H., Liu, Z., Tam, S. (2001) , A Fuzzy Analytical Hierarchy
  55. Process Approach in Modular Product D esign; Expert System, vol. 18 (1), page
  56. 32-42;
  57. [19] Liu, D.R., Shih, Y.Y. (2005) , Integrating AHP and Data Mining for
  58. Product Recommendation Based on Customer Lifetime V alue; Information and
  59. Management, vol. 42 (3), page 387–400;
  60. [20] Macharis, C., Springael, J., De Brucker, K., Verbeke, A. (2004) ,
  61. PROMETHEE and AHP: The Design of O perational Synergies in Multicriteria
  62. Analysis. Strengthening PROMETHEE with ideas of AHP ; European Journal of
  63. Operational Research, vol. 153 (2), page 307-317;
  64. [21] Mergias, I., Moustakas, K., Papadopoulos, A., Loizidou, M. (2007), Multi-
  65. criteria D ecision a id Approach fort the Selection of the Best C ompromise
  66. Management S cheme for ELVs: The case of Cyprus ; Journal of Hazardous
  67. Materials, vol. 147, page 706–717;
  68. [22] Nankervis, A.R., Compton, R.L., McCarthy, T.E. (1993), Strategic Human
  69. Resource Management; South Melbourne: Thomas Nelson;
  70. [23] Ong, S.K., Sun, M.J., Nee, A.Y.C. (2003) , A Fuzzy Set AHP -based DFM
  71. Tool for Rotational P arts; Journal of Materials Processing Technology, vol. 138,
  72. page 223–230;
  73. [24] Saaty, T.L. (1980), The Analytical Hierarchy Process; New York: McGraw-
  74. Hill.
  75. [25] Scholl, A., Manthey, L., Helm, R., Steiner, M. (2005) , Solving Multi -
  76. attribute Design Problems with Analytic Hierarchy Process and Conjoint
  77. Analysis: An Empirical C omparison; European Journal of Operational Research,
  78. vol. 164 (3), page 760–777;
  79. [26] Trevor, O.C., Nyberg, J.A. (2008) , Keeping your D ead count when all
  80. about you losing theirs: Downsizing, Voluntary Turnover Rates and the
  81. Moderating Role of HR practices; Acad. Mange. J., vol. 51, page 259-276;
  82. [27] Yaakob, S.B., Kaw ata, S. (1999) , Workers’ placement in an Industrial
  83. Environment; Fuzzy Sets and Systems, vol. 106, page 289–297;
  84. [28] Yurdakul, M. (2002) , Measuring a Manufacturing System’s Performance
  85. Using Saaty’s System with Feedback A pproach; Integrated Manufacturing
  86. Systems, vol. 13 (1), page 25–34.

Similar Articles

1-10 of 363

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)