Abstract

In this paper, we address the multiple-resource surgical case scheduling(MRSCS) problem in multi-operating theat re to minimize makespan . The constraints of no -wait multiple resource flexible job shop problem (FJSP) are considered for formulating MRSCS problem because the environment of the operating room is similar to the FJSP. Minimization of makespan forMRSCS is NP-hard combinatorial optimization problem; hence we employ the ant colony optimization algorithm so as to tackle this problem. These proposed approaches are illustrated by three test cases include small, medium, and large dataset. Consequently, the results of the experiments indicate that ant colony system and elitism ant system outperform traditiona l ant system since, the mean, the standard deviation, the best, and the worst solutions of proposed algorithms are better than the results of the traditional algorithm.

References

  1. [1] Al-Refaie, A., Judeh, M., Chen, T. (2018) ,Optimal Multiple-Period
  2. Scheduling and Sequencing of Operating Room and Intensive Care
  3. Unit;operational Research,18(3), pp. 645-670;
  4. [2] Arun, B., Kumar, T.V. (2017), Materialized View Selection Using Bumble
  5. Bee Mating Optimization;International Journal of Decision Support System
  6. Technology, 9(3), pp. 1-27;
  7. [3] Behmanesh, R. (2016), Nephron Algorithm Optimization: Inspired of the
  8. Biologic Nephron Performance;International Journal of Applied Metaheuristic
  9. Computing, Vol. 7(1), pp. 38-64;
  10. [4] Behmanesh, R., Zandieh, M., Hadji Molana, S. (2019), The Surgical Case
  11. Scheduling Problem with Fuzzy Duration Time: An Ant System
  12. Algorithm;Scientia Iranica, 26(3), pp. 1824-1841;
  13. [5] Behmanesh, R.& Zandieh, M. (2019), Surgical Case Scheduling Problem
  14. with Fuzzy Surgery Time: An Advanced Bi-Objective Ant System Approach;
  15. Knowledge-Based Systems, 104913;
  16. [6] Beliën, J., Demeulemeester, E. (2007) , Building Cyclic Master Surgery
  17. Schedules with Leveled Resulting Bed Occupancy; European Journal of
  18. Operational Research, Vol. 176, pp. 1185–1204;
  19. [7] Beliën, J., Demeulemeester, E., Cardoen, B. (2009) , A Decision Support
  20. System for Cyclic Master Surgery Scheduling with Multiple Objectives; J sched,
  21. 12, pp. 147-161;
  22. [8] Dekhici, L., Belkadi, K. (2015) , A Bat Algorithm with Generalized Walk for
  23. the Two-Stage Hybrid Flow Shop Problem; International Journal of Decision
  24. Support System Technology, 7(3), pp. 1-16;
  25. [9] Denton, B., Viapiano, J., Vogl, A. (2007), Optimization of Surgery
  26. Sequencing and Scheduling Decisions under Uncertainty;Health Care
  27. Management Science, 10(1), pp. 13–24;
  28. [10] Dorigo, M., Maniezzo, V., Colorni, A. (1991), Positive Feedback as a
  29. Search Strategy;Technical Report 91-016, Dip. Elettronica, Politecnico di Milano,
  30. Italy;
  31. [11] Dorigo, M. (1992), Optimization, Learning, and Natural Algorithms; PhD
  32. Thesis, Dip. Elettronica, Politecnico di Milano, Italy, (in Italian);
  33. Reza Behmanesh, Mostafa Zandieh, Seyyed Mohammad Hadji Molana
  34. __________________________________________________________________
  35. 268
  36. DOI: 10.24818/18423264/54.1.20.16
  37. [12] Dorigo, M., Maniesso, V., Colorni, A. (1996), The Ant System:
  38. Optimization by a Colony of Cooperating Agents;IEEE Trans. Systems Man
  39. Cybernet. B 26(1), pp. 29–41;
  40. [13] Dorigo, M., Gambardella, L.M. (1997) , Ant Colony System: A Cooperative
  41. Learning Approach to the Traveling Salesman Problem; IEEE Trans. Evolut.
  42. Comput. 1, pp. 53–66;
  43. [14] Fei, H., C. Chu, N. Meskens. (2009), Solving a Tactical Operating Room
  44. Planning Problem by a Column-Generation-Based Heuristic Procedure with
  45. Four Criteria;Annals of Operations Research, 166(1). pp. 91–108;
  46. [15] Hashemi Doulabi, S. H., Rousseau, L. M., Pesant. G. (2016) , A
  47. Constraint-Programming-Based Branch-and-Price-and-Cut Approach for
  48. Operating Room Planning and Scheduling,informs Journal onComputing, 28(3),
  49. pp. 432–448;
  50. [16] Jebali, A., Hadjalouane, A., & Ladet, P. (2006), Operating Rooms
  51. Scheduling;International Journal of Production Economics, 99(1–2), pp. 52–62;
  52. [17] Lamiri M., Grimaud F., Xie X. (2009) , Optimization Methods for a
  53. Stochastic Surgery Planning Problem;Int J Prod Econ, 120(2), pp. 400–410;
  54. [18] Liu, Hongwei; Zhang, Tianyi; Luo, Shuai (2018), Operating Room
  55. Scheduling and Surgeon Assignment Problem under Surgery Durations
  56. Uncertainty;Technology and Health Care,26(2), pp. 297-304;
  57. [19] Magerlein, J.M., Martin, J.B. (1978) , Surgical Demand Scheduling: A
  58. Review;Health Service Research, 13, pp. 418–433;
  59. [20] Marques, I., Captivo, M.E., Vaz Pato, M. (2014), Scheduling Elective
  60. Surgeries in a Portuguese Hospital Using a Genetic Heuristic;Operations
  61. Research for Health Care, Vol. 3(2), pp. 59-72;
  62. [21] Pham, Dinh-Nguyen, Klinkert, Andreas (2008) , Surgical Case Scheduling
  63. as a Generalized Job Shop Scheduling Problem; European Journal of
  64. Operational Research, Vol. 185, pp. 1011–1025;
  65. [22] Roshanaei, V., Luong, C., Aleman, D.M., Urbach, D.R.
  66. (2017),Collaborative Operating Room Planning and Scheduling;Informs journal
  67. on computing, Vol. 29(3), pp. 558-580;
  68. [23] Saremi, A., Jula, P., ElMekkawy, T., Wang, G.G. (2013), Appointment
  69. Scheduling of Outpatient Surgical Services in a Multistage Operating Room
  70. Department; Int. J. Production Economics, Vol. 141, pp. 646–658;
  71. [24] Xiang, W., Yin, J., Lim, G. (2015) , An Ant Colony Optimization Approach
  72. for Solving an Operating Room Surgery Scheduling Problem;Computers &
  73. Industrial Engineering, Vol. 85, pp. 335–345;
  74. [25] Zhao, Z., Li, X. (2014) , Scheduling Elective Surgeries with Sequence-
  75. Dependent Setup Times to Multiple Operating Rooms Using Constraint
  76. Programming;Operations Research for Health Care, Vol. 3(3), pp. 160-167.

Similar Articles

141-150 of 838

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)