Robust Operating Room Scheduling: A Two Stage Advanced Ant System
Naghshejahan Higher Education Institute, Isfahan, Iran
Abstract
In this paper, we address the multiobjective surgical case scheduling (MOSCS) problem in a multioperating theatre environment with uncertain service times in order to minimise the makespan, the number of the nonscheduled surgical cases, robustness, stability, and nervousness. The planning contains two stages; in the first stage, the elective patients are scheduled considering two former criteria using a Pareto ant system and then in the second stage, after arriving emerge ncy patients online, the plan is rescheduled considering three later objectives addition to makespan using a new max -min ant system. On the other hand, we take into account fuzzy numbers for processing times of all stages, and hereafter the problem called multiobjective fuzzy SCS. This problem is strongly an NP -hard optimisation problem; hence we employ a two- stage algorithm including a fuzzy Pareto envelope-based selection ant system so as to tackle the first stage of problem and a new multiobjective Max-Min ant system for solving the second stage of the problem. Moreover, this proposed approach is illustrated by providing three test cases. Therefore, the performance of the proposed algorithm on all test instances is compared to a basic multiobjective ant s ystem under the fuzzy condition, namely Pareto strength ant colony optimisation. Consequently, computational experiments state that our proposed approach outperforms another algorithm, and the results indicate the efficiency and effectiveness of the proposed algorithm in comparison with the traditional algorithm for solving the problem.
References
- [1] Behmanesh, R., Zandieh, M. (2019), Surgical Case Scheduling Problem with Fuzzy
- Surgery Time: An Advanced Bi -Objective Ant System Approach. Knowledge-Based
- Systems, 104913.
- [2] Behmanesh, R., Zandieh, M., Hadji Molana, S.M. (2020), Multiple Resource Surgical
- Case Scheduling Problem: Ant Colony System Approach. Economic Computation and
- Economic Cybernetics Studies and Research, 54(1), 251-268.
- [3] Bargetto, R., Garaix, T., Xie, X. (2023), A branch- and-price-and-cut algorithm for
- operating room scheduling under human resource constraints . Computers and
- Operations Research, 152, 106136.
- [4] Denton, B., Viapiano, J., Vogl, A. (2007), Optimization of surgery sequencing and
- scheduling decisions under uncertainty . Health Care Management Science , 10(1),
- 13-24.
- [5] Fei, H., Meskens, N., Chu, C. (2010), A planning and scheduling problem for an
- operating theatre using an open scheduling strategy . Computers and Industrial
- Engineering, 58, 221-230.
- [6] Fügener, A., Hans, E.W., Kolisch, R., Kortbeek, N., Vanberkel, P.T. (2014), Master
- surgery scheduling with consideration of multiple downstream Units . European
- Journal of Operational Research, 239, 227-236.
- [7] Gonzalez-Rodriguez, I., Vela, C.R., Puente, J., Hernandez- Arauzo, A. (2008a),
- Improved Local Search for Job Shop Scheduling with Uncertain Durations.
- Proceedings of the Nineteenth International Conference on Automated Planning and
- Scheduling, 124-131.
- [8] Gonzalez-Rodriguez, I., Puente, J., Vela, C. R.,Varela, R. (2008b), Semantics of
- schedules for the fuzzy job- shop problem . IEEE Transactions on Systems Man and
- Cybernetics – Part A: Systems and Humans, 38, 655-666.
- [9] Gür, Ş., Alakaş, H.M., Pınarbaşı, M., Eren, T. (2023), Stochastic operating room
- scheduling: a new model for solving problem and an approach for determining the
- factors that affect operation time variations. Soft Computing, 1-21.
- [10] Lee, S., Yuehwern, Y. (2014), Reducing patient-flow delays in surgical suites through
- determining start-times of surgical cases. European Journal of Operational Research,
- 238, 620–629.
- [11] Lin, J. (2015), A hybrid biogeography -based optimization for the fuzzy flexible job -
- shop scheduling problem. Knowledge-Based Systems, 78, 59-74.
- [12] Lin, Y.K., Li, M.Y. (2021), Solving operating room scheduling problem using artificial
- bee colony algorithm. In Healthcare 9(2), 152, MDPI.
- [13] Marques, I., Captivo, M.E. (2015), Bicriteria elective surgery scheduling using an
- evolutionary algorithm. Operations Research for Health Care, 7(24), 14-26.
- Robust Operating Room Scheduling: A Two Stage Advanced Ant System
- Vol. 58, Issue 2/2024 231
- [14] Marques, I., Captivo, E.M. (2017), Different stakeholders’s perspectives for a surgical
- case assignment problem: deterministic and robust approaches . European Journal of
- Operational Research, 261 (1), 260-278.
- [15] Rachuba, S., Werners, B. (2017), A fuzzy multi-criteria approach for robust operating
- room schedules. Annals of Operations Research, 251(1-2), 325-350.
- [16] Saremi, A., Jula, P., ElMekkawy, T., Wang, G.G. (2013), Appointment scheduling of
- outpatient surgical services in a multistage operating room department . International
- Journal of Production Economics, 141, 646-658.
- [17] Stuart, K ., Kozan, E . (2012), Reactive scheduling model for the operating theatre .
- Flexible Services and Manufacturing Journal, 24, 400-421.
- [18] Wang, L. (2022), Operating room planning and scheduling under uncertainty:
- Modeling, analysis and optimization. PhD Thesis, LIRIAS3916512, Ku Leuven.
- [19] Wang, L., Demeulemeester, E., Vansteenkiste, N., Rademakers, F.E. (2021),
- Operating room planning and scheduling for outpatients and inpatients: A review and
- future research. Operations Research for Health Care, 31, 100323.
- [20] Wang, J.J., Dai, Z., Zhang, W., Shi, J.J. (2023), Operating room scheduling for non -
- operating room anesthesia with emergency uncertainty . Annals of Operations
- Research, 321(1-2), 565-588.
- [21] Xiang, W., Yin, J., Lim, G. (2015), An ant colony optimization approach for solving
- an operating room surgery scheduling problem . Computers and Industrial
- Engineering, 85, 335-345.
- [22] Yang, M.C., Pan, Q.K., Sang, H. Y., Li, W.M., Wang, Y.L. (2023), A slack speed -up
- based discrete artificial bee colony algorithm for resource-constrained operating room
- scheduling problem. Computers and Industrial Engineering, 186, 109760.