Articles
Vol. 47 No. 1 (2013)
A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR Methods under Fuzzy Environment
Young Research Club Sari Branch Azad University, Sari, Iran
-
Submitted
-
October 24, 2026
Abstract
Productivity is one of the most significant factors in an organization’s general performance . Regarding to the key role of banking industry in economic, social and political development, producti vity improvement on each of its branches will be an effective factor for society productivity improvement. Productivity improvement in organizations is as one of executive managers and decision makers’ main challenges in each country. Multiple criteria dec ision-making (MCDM) research has developed rapidly and has become a main area of research for dealing with complex decision problems. FAHP, TOPSIS, VIKOR and SAW are used as MCDM techniques in the present study. The proposed method enables decision analysts to better understand the complete evaluation process and provide a more accurate, effective and systematic decision support. In this paper, we study the importance degree of three effective dimensions (human resource, financial and management performance ) on productivity improvement and also their sub criteria in state -owned, partially private and private banks in Iran. Fuzzy Analytic Hierarchy Process (FAHP) is applied for evaluating productivity improvement. TOPSIS, VIKOR and SAW are utilized for ranking the three mentioned banks. Our results indicate that among three mentioned productivity dimensions, management performance productivity is of the greater importance than human resource and financial productivity and private banks have gained the highest priority of all.
References
- [1] Akhavan Tabassi A, Abu Bakar A.H. (2009), Training, motivation,
- and performance: The case o f human resource management in
- construction projects in Mashhad , Iran, International Journal of Project
- Management 27, 471–480;
- [2] Azadeh, A. Ghaderi, S.F, Mirjalali, M. Moghaddam, M. (2011),
- Integration or hierarchy process and data envelopment analysis for
- assessment and optimization of personnel productivity in a large
- industrial bank , Journal of Expert System with Applications 38, 5212 -
- 5225.
- [3] Bozdag, C. E., Kahraman, C., Ruan, D. (2003 ), Fuzzy group decision
- making for selection among computer integrated manufacturing systems,
- Computers in Industry, 51(1), 13–29.
- [4] Barth J. R, Caprio G, Levine R. (2004), Bank regulation and
- supervision: What works best? Journal of Financial Intermediation, 13,
- 205–248.
- [5] Broadbent J. & Laughlin R (2009) Performance management systems:
- A conceptual model, Management Accounting Research, 20, 283–295.
- [6] Cassiman B, Golovko E, Martinez -Ros E (2010), Innovation, exports
- and productivity , International Journal of Industrial Organization, 28,
- 372-376.
- [7] Cebeci, U., Ruan, D., (2007 ), A M ulti-Attribute comparison of Turkish
- quality consultants by Fuzzy AHP , International Journal of Information
- Technology and Decision Making, 6 (1), 191-207.
- [8] Chang, D. Y. (1996), Applications of extent analysis method on fuzzy
- AHP; European Journal of Operational Research 95, 649–655.
- [9] Chang, D.Y. (1992), Extent analysis and synthetic decision, Optimization
- Techniques and Applications, 1, 352.
- [10] Che, Z.H., Wang, H.S. Chuang C.L. (2010), A fuzzy AHP and DEA
- approach for making bank loan decisions for small and medium
- enterprises in Taiwan, Expert Systems with Applications 37, 7189–7199.
- [11] Chen SH (1985), Ranking fuzzy numbers with maximizing set and
- minimizing set, Fuzzy Sets and System, 17 (2), 1113-129.
- A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR
- Methods under Fuzzy Environment
- [12] Cua, K.O., McKone, K.E., Schroeder, R.G. (2001), Relationships
- between implementation of TQM, JIT, and TPM and manufacturing
- performance; Journal of Operations Management, 19 (6), 675–694.
- [13] Devi K (2011), Extension of VIKOR method in intuitionistic fuzzy
- environment for robot selection ; Expert Systems with Applicat ions 38:
- 14163–14168.
- [14] Doliente J. S. (2005), Determinants of bank net interest margins of
- Southeast Asia, Applied Financial Economics Letters, 1(1), 53-57.
- [15] Efendigil, T., Önüt, S., Kon gar, E., (2008), A holistic approach for
- selecting a third -party reverse logistics provider in the presence of
- vagueness; Computers and Industrial Engineering, 54 (2), 269-287.
- [16] Eppolito, L. (2002), Productivity Guidelines for Community Bankers.
- BankTalk: BISYS Online Magazine.
- [https://www.bank.bisys.com/banktalk_leppolito01.asp]
- and[https://www.bank.bisys.com/banktalk_leppolito02.asp].
- [17] Epure Mircea, Kerstens Kristiaan, Prior Diego (2011), Bank
- productivity and performance groups: A decomposition approach based
- upon the Luenberger productivity indicator ; European Journal of
- Operational Research, 211, 630–641.
- [18] Eshraghniae Jahromi A. and Borjalilu, N. (2010), Presenting a model
- for productivity measurement and improvement in Plastiran , 8th
- International Management Conference in Iran, Tehran.
- [19] Ferreira, A and Otley, D. (2009), The Design and Use of Performance
- Management Systems: An Extended Framework for Analysis ,
- Management Accounting Research, 20, 263–282.
- [20] Fouladgar, M. M., Yazdani -Chamzini, A., Zavadskas, E. K. (2011),
- An integrated model for prioritizing strategies of the Iranian mining
- sector, Technological and Economic Development of Economy 17(3): 459-
- 483.
- [21] García F, Guijarro F, Moya I (2010), Ranking Spanish savings banks:
- A multi criteria approach , Mathematical and Computer Modeling 52,
- 1058_1065.
- [22] Gill Avninder (2011), Measurement and Comparison of Productivity
- Performance Under Fuzzy Imprecise Data, International Journal of
- Business Research and Management (IJBRM0): 2(1), 19-32.
- [23] Heo, E., Kim, J., Boo, K. J. (2010), Analysis of the assessment factors
- for renewable energy dissemination program evaluation using fuzzy
- AHP, Renewable and Sustainable Energy Reviews 14, 2214–2220.
- [24] Huczynski A, Bachnan D (2001), Organizational Behavior , Fourth
- Edition, Prentice Hall.
- [25] Hwang, C.L., and Yoon, K., (1981), Multiple Attribute Decision
- Making: Methods and Applications, New York: Springer-Verlag.
- [26] Islam R and Ismail A Z (2008), Employee Motivation: a Malaysian
- Perspective, International Journal of Commerce and Management , 344 –
- 362.
- Maedeh Sedaghat
- [27] Jabbour C, Charbel J, Ce´sar Almada Santos, F. (2008), Relationships
- between human resource dimensions and environmental management in
- companies: proposal of a model , Journal of Cleaner Productio n, 16, 51-
- 58.
- [28] Jaffry S, Ghulam Y and Cox J (2008), Labour use efficiency in the
- Indian and Pakistani commercial bank , Journal of Asian Economics , 19:
- 259–293.
- [29] Jensen, P.L., and Alting, L. (2006), Human Factors in the
- Management of Production, Department of Manufacturing Engineering
- and Management Building 424, Technical Annals of the CIRP, 5(1), 457 -
- 460.
- [30] Kahraman, C., Ruan, D., D Ögan, ˙I. (2003), Fuzzy group decision
- making for facility location selection, Information Sciences 157, 135–153.
- [31] Kahraman, C., C ebeci, U., Ruan, D. (2004), Multi-attribute
- comparison of catering service companies using fuzzy AHP: The case of
- Turkey. International Journal of Production Economics, 87, 171–184.
- [32] Kauko, K. (2009), Managers and Efficiency in Banking , Journal of
- Banking & Finance, 33, 546–556.
- [33] Kaya T., Kahraman C. (2011), Multicriteria Decision making in
- energy planning using a modified fuzzy TOPSIS methodology , Expert
- Systems with Applications 38: 6577–6585.
- [34] Kaya T., Kahraman C. (2011), Fuzzy multiple criteria forestry decision
- making based on an integrated VIKOR and AHP approach , Expert
- Systems with Applications 38: 7326–7333.
- [35] Kazaz A, Ulubeyli S, (2007), Drivers of productivity among
- Construction workers: A study in a developing country . .Building and
- Environment 42(5): 2132-2140.
- [36] Kopelman R.E (1986), Alternative work schedules and productivity: A
- review of the evidence National Productivity Review , Managing
- Productivity in Organization, 5(2), 150–165.
- [37] Kutlu A.C., Ekmekciog˘lu M. (2012), Fuzzy failure modes and effects
- analysis by using fuzzy TOPSIS -based fuzzy AHP , Expert Systems with
- Applications, 39(1), 61-67.
- [38] Lin, E.-K., Chang, C.-C., Lin, Y.-C. (2011), Structure development and
- performance evaluation of construction knowledge management system,
- Journal of Civil Engineering and Management 17(2): 184-196.
- [39] Liu Y., Combs JG., Ketchen Jr DJ, Ireland R. D. (2007 ), The value of
- human resource management for organizational performance , Business
- Horizons, 50 (6), 50, 503–511.
- [40] Margono H, Sharma S, Melvin II D.P (2010), Cost efficiency,
- economies of scale, technological progress and productivity in
- Indonesian banks, Journal of Asian Economics 21: 53–65.
- [41] Masso J., and Vahter P (2011), The Link between I nnovation and
- Productivity in Estonia’s Service Sectors by William Davidson Institute
- A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR
- Methods under Fuzzy Environment
- Working Paper Number 1012 . The Service Industries Journal .
- DOI:10.1080/02642069.2011.600444.
- [42] O’Neill, T., Egelton, R., Hogue, R. (1999), Canadian Productivity –
- The sky is not Falling; Bank of Montreal Economics, Economic analysis:
- Special report. [http: //www.bmo.com/economic/regular/canprod.pdf].
- [43] Önüt, S., Efendigil, T., Karar, S. S., (2010), A combined fuzzy MCDM
- approach for selecting shopping center site: An example f rom Istanbul,
- Turkey;Expert Systems with Applications, 37: 1973–1980.
- [44] Önüt, S., Kara, S. S., Efendigil, T. (2008), A hybrid fuzzy MCDM
- approach to machine tool selection , Journal of Intelligent Manufacturing
- 19, 443–453.
- [45] Opricovic S (1998), Multicriteria optimization of civil engineering
- systems, Faculty of Civil Engineering, Belgrade.
- [46] Opricovic S. (2011), Fuzzy VIKOR with an application to water
- resources planning, Expert Systems with Applications 38: 12983–12990.
- [47] Neveu, R.P. (1989). Fundamentals of Managerial Finance , 3rd ed.,
- Cincinnati, Ohio: Siuth Western Publication Co.
- [48] Ray, S.C., Das, A. (2010), Distribution of cost and profit efficiency:
- Evidence from Indian Banking , European Journal of Operational
- Research, 201(1), 297–307.
- [49] Sanayei A., Mousavi S.F., Yazdankhah A. (2010), Group decision
- making process for supplier selection with VIKOR under fuzzy
- environment, Expert Systems with Applications 37: 24–30.
- [50] Sanyal P, Shankar R (2011), Ownership, competition, and bank
- productivity: An analysis of Indi an banking in the post -reform period,
- International Review of Economics and Finance 20: 225–247.
- [51] Saremi M., Mousavi S.F., Sanayei A. (2009), TQM consultant selection
- in SMEs with TOPSIS under fuzzy environment , Expert Systems with
- Applications 36: 2742–2749.
- [52] Secme N.Y., Bayrakdarog˘lu A., Kahraman C. (2009), Fuzzy
- performance evaluation in Turkish Banking Sector using Analytic
- Hierarchy Process and TOPSIS, Expert Systems with Applications 36,
- 11699–11709.
- [53] Shemshadi A, Shirazi H., Toreihi M., Tarokh M.J. (20 11), A fuzzy
- VIKOR method for supplier selection based on entropy measure for
- objective weighting, Expert Systems with Applications 38: 12160–12167.
- [54] Sivapirakasam S.P., Mathew J., Surianarayanan M. (2011 ), Multi -
- attribute decision making for green electri cal discharge machining ,
- Expert Systems with Applications 38: 8370–8374.
- [55] Sun C.C., (2010), A performance evaluation model by integrating fuzzy
- AHP and fuzzy TOPSIS methods , Expert Systems with Applications 37:
- 7745–7754.
- [56] Tubbs S, and Moss S, (2000), Human communication, Eighth Edition,
- McGraw-Hill.
- Maedeh Sedaghat
- [57] Wu H.Y., Tzeng G.H. and Chen Y.H (2009), A fuzzy MCDM approach
- for evaluating banking performance based on Balanced Scorecard ,
- Expert Systems with Applications 36: 10135–10147.
- [58] Wynder J. M. (2011), Chemico: Evaluating performance based on the
- Balanced Scorecard, Journal of Accounting Education, 28 (3-4), 221-236.
- [59] Wang TC and Chang TH (2005), Fuzzy VIKOR as a resolution for
- multicriteria group decision making, The 11th International Conference
- on Industrial Engineering and Engineering Management, 352-356.
- [60] Yu PL. (1973), A class of solutions for group decision problems ,
- Management Science, 19 (8), 936-946.