Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 47 No. 1 (2013)

A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR Methods under Fuzzy Environment

Submitted
October 24, 2026

Abstract

Productivity is one of the most significant factors in an organization’s general performance . Regarding to the key role of banking industry in economic, social and political development, producti vity improvement on each of its branches will be an effective factor for society productivity improvement. Productivity improvement in organizations is as one of executive managers and decision makers’ main challenges in each country. Multiple criteria dec ision-making (MCDM) research has developed rapidly and has become a main area of research for dealing with complex decision problems. FAHP, TOPSIS, VIKOR and SAW are used as MCDM techniques in the present study. The proposed method enables decision analysts to better understand the complete evaluation process and provide a more accurate, effective and systematic decision support. In this paper, we study the importance degree of three effective dimensions (human resource, financial and management performance ) on productivity improvement and also their sub criteria in state -owned, partially private and private banks in Iran. Fuzzy Analytic Hierarchy Process (FAHP) is applied for evaluating productivity improvement. TOPSIS, VIKOR and SAW are utilized for ranking the three mentioned banks. Our results indicate that among three mentioned productivity dimensions, management performance productivity is of the greater importance than human resource and financial productivity and private banks have gained the highest priority of all.

References

  1. [1] Akhavan Tabassi A, Abu Bakar A.H. (2009), Training, motivation,
  2. and performance: The case o f human resource management in
  3. construction projects in Mashhad , Iran, International Journal of Project
  4. Management 27, 471–480;
  5. [2] Azadeh, A. Ghaderi, S.F, Mirjalali, M. Moghaddam, M. (2011),
  6. Integration or hierarchy process and data envelopment analysis for
  7. assessment and optimization of personnel productivity in a large
  8. industrial bank , Journal of Expert System with Applications 38, 5212 -
  9. 5225.
  10. [3] Bozdag, C. E., Kahraman, C., Ruan, D. (2003 ), Fuzzy group decision
  11. making for selection among computer integrated manufacturing systems,
  12. Computers in Industry, 51(1), 13–29.
  13. [4] Barth J. R, Caprio G, Levine R. (2004), Bank regulation and
  14. supervision: What works best? Journal of Financial Intermediation, 13,
  15. 205–248.
  16. [5] Broadbent J. & Laughlin R (2009) Performance management systems:
  17. A conceptual model, Management Accounting Research, 20, 283–295.
  18. [6] Cassiman B, Golovko E, Martinez -Ros E (2010), Innovation, exports
  19. and productivity , International Journal of Industrial Organization, 28,
  20. 372-376.
  21. [7] Cebeci, U., Ruan, D., (2007 ), A M ulti-Attribute comparison of Turkish
  22. quality consultants by Fuzzy AHP , International Journal of Information
  23. Technology and Decision Making, 6 (1), 191-207.
  24. [8] Chang, D. Y. (1996), Applications of extent analysis method on fuzzy
  25. AHP; European Journal of Operational Research 95, 649–655.
  26. [9] Chang, D.Y. (1992), Extent analysis and synthetic decision, Optimization
  27. Techniques and Applications, 1, 352.
  28. [10] Che, Z.H., Wang, H.S. Chuang C.L. (2010), A fuzzy AHP and DEA
  29. approach for making bank loan decisions for small and medium
  30. enterprises in Taiwan, Expert Systems with Applications 37, 7189–7199.
  31. [11] Chen SH (1985), Ranking fuzzy numbers with maximizing set and
  32. minimizing set, Fuzzy Sets and System, 17 (2), 1113-129.
  33. A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR
  34. Methods under Fuzzy Environment
  35. [12] Cua, K.O., McKone, K.E., Schroeder, R.G. (2001), Relationships
  36. between implementation of TQM, JIT, and TPM and manufacturing
  37. performance; Journal of Operations Management, 19 (6), 675–694.
  38. [13] Devi K (2011), Extension of VIKOR method in intuitionistic fuzzy
  39. environment for robot selection ; Expert Systems with Applicat ions 38:
  40. 14163–14168.
  41. [14] Doliente J. S. (2005), Determinants of bank net interest margins of
  42. Southeast Asia, Applied Financial Economics Letters, 1(1), 53-57.
  43. [15] Efendigil, T., Önüt, S., Kon gar, E., (2008), A holistic approach for
  44. selecting a third -party reverse logistics provider in the presence of
  45. vagueness; Computers and Industrial Engineering, 54 (2), 269-287.
  46. [16] Eppolito, L. (2002), Productivity Guidelines for Community Bankers.
  47. BankTalk: BISYS Online Magazine.
  48. [https://www.bank.bisys.com/banktalk_leppolito01.asp]
  49. and[https://www.bank.bisys.com/banktalk_leppolito02.asp].
  50. [17] Epure Mircea, Kerstens Kristiaan, Prior Diego (2011), Bank
  51. productivity and performance groups: A decomposition approach based
  52. upon the Luenberger productivity indicator ; European Journal of
  53. Operational Research, 211, 630–641.
  54. [18] Eshraghniae Jahromi A. and Borjalilu, N. (2010), Presenting a model
  55. for productivity measurement and improvement in Plastiran , 8th
  56. International Management Conference in Iran, Tehran.
  57. [19] Ferreira, A and Otley, D. (2009), The Design and Use of Performance
  58. Management Systems: An Extended Framework for Analysis ,
  59. Management Accounting Research, 20, 263–282.
  60. [20] Fouladgar, M. M., Yazdani -Chamzini, A., Zavadskas, E. K. (2011),
  61. An integrated model for prioritizing strategies of the Iranian mining
  62. sector, Technological and Economic Development of Economy 17(3): 459-
  63. 483.
  64. [21] García F, Guijarro F, Moya I (2010), Ranking Spanish savings banks:
  65. A multi criteria approach , Mathematical and Computer Modeling 52,
  66. 1058_1065.
  67. [22] Gill Avninder (2011), Measurement and Comparison of Productivity
  68. Performance Under Fuzzy Imprecise Data, International Journal of
  69. Business Research and Management (IJBRM0): 2(1), 19-32.
  70. [23] Heo, E., Kim, J., Boo, K. J. (2010), Analysis of the assessment factors
  71. for renewable energy dissemination program evaluation using fuzzy
  72. AHP, Renewable and Sustainable Energy Reviews 14, 2214–2220.
  73. [24] Huczynski A, Bachnan D (2001), Organizational Behavior , Fourth
  74. Edition, Prentice Hall.
  75. [25] Hwang, C.L., and Yoon, K., (1981), Multiple Attribute Decision
  76. Making: Methods and Applications, New York: Springer-Verlag.
  77. [26] Islam R and Ismail A Z (2008), Employee Motivation: a Malaysian
  78. Perspective, International Journal of Commerce and Management , 344 –
  79. 362.
  80. Maedeh Sedaghat
  81. [27] Jabbour C, Charbel J, Ce´sar Almada Santos, F. (2008), Relationships
  82. between human resource dimensions and environmental management in
  83. companies: proposal of a model , Journal of Cleaner Productio n, 16, 51-
  84. 58.
  85. [28] Jaffry S, Ghulam Y and Cox J (2008), Labour use efficiency in the
  86. Indian and Pakistani commercial bank , Journal of Asian Economics , 19:
  87. 259–293.
  88. [29] Jensen, P.L., and Alting, L. (2006), Human Factors in the
  89. Management of Production, Department of Manufacturing Engineering
  90. and Management Building 424, Technical Annals of the CIRP, 5(1), 457 -
  91. 460.
  92. [30] Kahraman, C., Ruan, D., D Ögan, ˙I. (2003), Fuzzy group decision
  93. making for facility location selection, Information Sciences 157, 135–153.
  94. [31] Kahraman, C., C ebeci, U., Ruan, D. (2004), Multi-attribute
  95. comparison of catering service companies using fuzzy AHP: The case of
  96. Turkey. International Journal of Production Economics, 87, 171–184.
  97. [32] Kauko, K. (2009), Managers and Efficiency in Banking , Journal of
  98. Banking & Finance, 33, 546–556.
  99. [33] Kaya T., Kahraman C. (2011), Multicriteria Decision making in
  100. energy planning using a modified fuzzy TOPSIS methodology , Expert
  101. Systems with Applications 38: 6577–6585.
  102. [34] Kaya T., Kahraman C. (2011), Fuzzy multiple criteria forestry decision
  103. making based on an integrated VIKOR and AHP approach , Expert
  104. Systems with Applications 38: 7326–7333.
  105. [35] Kazaz A, Ulubeyli S, (2007), Drivers of productivity among
  106. Construction workers: A study in a developing country . .Building and
  107. Environment 42(5): 2132-2140.
  108. [36] Kopelman R.E (1986), Alternative work schedules and productivity: A
  109. review of the evidence National Productivity Review , Managing
  110. Productivity in Organization, 5(2), 150–165.
  111. [37] Kutlu A.C., Ekmekciog˘lu M. (2012), Fuzzy failure modes and effects
  112. analysis by using fuzzy TOPSIS -based fuzzy AHP , Expert Systems with
  113. Applications, 39(1), 61-67.
  114. [38] Lin, E.-K., Chang, C.-C., Lin, Y.-C. (2011), Structure development and
  115. performance evaluation of construction knowledge management system,
  116. Journal of Civil Engineering and Management 17(2): 184-196.
  117. [39] Liu Y., Combs JG., Ketchen Jr DJ, Ireland R. D. (2007 ), The value of
  118. human resource management for organizational performance , Business
  119. Horizons, 50 (6), 50, 503–511.
  120. [40] Margono H, Sharma S, Melvin II D.P (2010), Cost efficiency,
  121. economies of scale, technological progress and productivity in
  122. Indonesian banks, Journal of Asian Economics 21: 53–65.
  123. [41] Masso J., and Vahter P (2011), The Link between I nnovation and
  124. Productivity in Estonia’s Service Sectors by William Davidson Institute
  125. A Productivity Improvement Evaluation Model by Integrating AHP, TOPSIS and VIKOR
  126. Methods under Fuzzy Environment
  127. Working Paper Number 1012 . The Service Industries Journal .
  128. DOI:10.1080/02642069.2011.600444.
  129. [42] O’Neill, T., Egelton, R., Hogue, R. (1999), Canadian Productivity –
  130. The sky is not Falling; Bank of Montreal Economics, Economic analysis:
  131. Special report. [http: //www.bmo.com/economic/regular/canprod.pdf].
  132. [43] Önüt, S., Efendigil, T., Karar, S. S., (2010), A combined fuzzy MCDM
  133. approach for selecting shopping center site: An example f rom Istanbul,
  134. Turkey;Expert Systems with Applications, 37: 1973–1980.
  135. [44] Önüt, S., Kara, S. S., Efendigil, T. (2008), A hybrid fuzzy MCDM
  136. approach to machine tool selection , Journal of Intelligent Manufacturing
  137. 19, 443–453.
  138. [45] Opricovic S (1998), Multicriteria optimization of civil engineering
  139. systems, Faculty of Civil Engineering, Belgrade.
  140. [46] Opricovic S. (2011), Fuzzy VIKOR with an application to water
  141. resources planning, Expert Systems with Applications 38: 12983–12990.
  142. [47] Neveu, R.P. (1989). Fundamentals of Managerial Finance , 3rd ed.,
  143. Cincinnati, Ohio: Siuth Western Publication Co.
  144. [48] Ray, S.C., Das, A. (2010), Distribution of cost and profit efficiency:
  145. Evidence from Indian Banking , European Journal of Operational
  146. Research, 201(1), 297–307.
  147. [49] Sanayei A., Mousavi S.F., Yazdankhah A. (2010), Group decision
  148. making process for supplier selection with VIKOR under fuzzy
  149. environment, Expert Systems with Applications 37: 24–30.
  150. [50] Sanyal P, Shankar R (2011), Ownership, competition, and bank
  151. productivity: An analysis of Indi an banking in the post -reform period,
  152. International Review of Economics and Finance 20: 225–247.
  153. [51] Saremi M., Mousavi S.F., Sanayei A. (2009), TQM consultant selection
  154. in SMEs with TOPSIS under fuzzy environment , Expert Systems with
  155. Applications 36: 2742–2749.
  156. [52] Secme N.Y., Bayrakdarog˘lu A., Kahraman C. (2009), Fuzzy
  157. performance evaluation in Turkish Banking Sector using Analytic
  158. Hierarchy Process and TOPSIS, Expert Systems with Applications 36,
  159. 11699–11709.
  160. [53] Shemshadi A, Shirazi H., Toreihi M., Tarokh M.J. (20 11), A fuzzy
  161. VIKOR method for supplier selection based on entropy measure for
  162. objective weighting, Expert Systems with Applications 38: 12160–12167.
  163. [54] Sivapirakasam S.P., Mathew J., Surianarayanan M. (2011 ), Multi -
  164. attribute decision making for green electri cal discharge machining ,
  165. Expert Systems with Applications 38: 8370–8374.
  166. [55] Sun C.C., (2010), A performance evaluation model by integrating fuzzy
  167. AHP and fuzzy TOPSIS methods , Expert Systems with Applications 37:
  168. 7745–7754.
  169. [56] Tubbs S, and Moss S, (2000), Human communication, Eighth Edition,
  170. McGraw-Hill.
  171. Maedeh Sedaghat
  172. [57] Wu H.Y., Tzeng G.H. and Chen Y.H (2009), A fuzzy MCDM approach
  173. for evaluating banking performance based on Balanced Scorecard ,
  174. Expert Systems with Applications 36: 10135–10147.
  175. [58] Wynder J. M. (2011), Chemico: Evaluating performance based on the
  176. Balanced Scorecard, Journal of Accounting Education, 28 (3-4), 221-236.
  177. [59] Wang TC and Chang TH (2005), Fuzzy VIKOR as a resolution for
  178. multicriteria group decision making, The 11th International Conference
  179. on Industrial Engineering and Engineering Management, 352-356.
  180. [60] Yu PL. (1973), A class of solutions for group decision problems ,
  181. Management Science, 19 (8), 936-946.

Similar Articles

1-10 of 191

You may also start an advanced similarity search for this article.