Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 47 No. 4 (2013)

An Efficient Hybrid Algorithm for Dynamic Facility Layout Problem Using Simulation Technique and PSO

Submitted
October 24, 2026

Abstract

In this research , a new hybrid heuristic method is developed by combination of discrete Particle Swarm Optimization (PSO) algorithm and simulation technique to address Dynamic Facility Layout P roblem (DFLP) which is the main contribution of the current study. DFLP is a NP -Hard problem, so there are several researches focused on heuristic algorithms to solve the problem. The proposed approach is the only research which uses simulation technique inside the PSO algorithm to enable it terminated faster. To show the efficiency of the proposed algorithm, several test problems have been examined and the results were compared to other algorithms. As the computational results show, the quality of solutions and the algorithm speed are suitable enough to be used in real world problems.

References

  1. [1] Tompkins, J. A., White, J. A., Bozer, Y. A., Frazelle, E. H., Tanchoco, J. M.
  2. &Trevino, J. (1996), Facilities planning; New York: Wiley;
  3. [2] Hammer, M. (1996), Beyond Reengineering; Harper Collins, New York;
  4. [3 Rezazadeh H, Ghazanfari M, Saidi Mehrabad M, Sadjadi Seyed Jafar. (2009),
  5. An Extended Particle Swarm Optimization Algorithm for Dynamic Facility Layout
  6. Problem; Journal of Zhejiang University Science A, 10(4):520-529;
  7. [4] Rosenblat, M. J., and Lee, H. L. (1987), A Robustness Approach to Facilities
  8. Design; International Journal of Production Research, 2 , 4, 479-486;
  9. [5] Rosenblatt, M. J. (1986), The Dynamics of Plant Layout. Management Science;
  10. 32(1), 76–86;
  11. [6] Benjaafar, S., Heragu, S. and Irani, S. (2002), Next Generation Factory
  12. Layouts: Research Challenges and Recent Progress; Interfaces, 32(6), 58–76;
  13. [7] Kouvelis, P., Kiran, A.S. (1991), Single and Multiple Period Layout Models for
  14. Automated Manufacturing Systems; European Journal of Operations Research
  15. 52(3):300–314;
  16. [8] Balakrishnan, J. (1993), Notes: The Dynamic of Plant Layout. Management
  17. Science; 39, 5, 654-655;
  18. [9] Lacksonen, T.A. (1994), Static and Dynamic Layout Problems with Varying
  19. Areas; Journal of the Operational Research Society 1994;45:59–69;
  20. [10] Kaku BK, Mazzola J.B. (1997), A Tabu Search Heuristic for the Dynamic
  21. Plant Layout Problem; INFORMS: Journal on Computing 1997;9:374–84;
  22. [11] Balakrishnan, J., Cheng, CH. (2000), Genetic Search and the Dynamic Layout
  23. Problem; Computers and Operations Research, 27:587–93;
  24. [12] Baykasoglu A, NNZ. (2001), A Simulated Annealing Algorithm for Dynamic
  25. Layout Problem; Computers and Operations Research, 28:1403–26;
  26. [13] Erel E, Ghosh JB, Simon JT. (2003), New Heuristic for the Dynamic Layout
  27. Problem; Journal of the Operational Research Society,54:1202–75;
  28. [14] Corry, P. and Kozen, E. (2004), Ant Colony Optimization for Machine Layout
  29. Problems; Computational optimization and applications, 28, 3, 287-310;
  30. [15] Enea, M. et al. (2005), The Facility Layout Problem Approach Using Fuzzy
  31. Model and a Genetic Search; Journal of Intelligence Manufacturing I, 16, 303-316;
  32. [16] Baykasoglu, A., Dereli, T. & Sabuncu, I. (2006), An Ant Colony Algorithm for
  33. Solving Budget Constrained and Unconstrained Dynamic Facility Layout Problems;
  34. Omega,2006;34(4), 385–396;
  35. An Efficient Hybrid Algorithm for Dynamic Facility Layout Problem using Simulation
  36. Technique and PSO
  37. [17] McKendall, A. R. Jr., Shang, J. & Kuppusamy, S. (2006), Simulated
  38. Annealing Heuristics for the Dynamic Facility Layout Problem; Computers and
  39. operations Research,33(8), 2431–2444;
  40. [18] Drira , A., Pierreval , H., Hajri-Gabouj, S. (2007), Facility Layout Problems:
  41. A survey; Annual Reviews in Control 31, 255–267;
  42. [19] Şahin, R., Türkbey, O. (2008), A New Hybrid Tabu-simulated Annealing
  43. Heuristic for the Dynamic Facility Layout Problem; International Journal of
  44. Production Research, 45, 1–19;
  45. [20] Liang, L. Y., Chao, W. C. (2008), The Strategies of Tabu Search Technique for
  46. Facility Layout Optimization; Automation in Construction 17, 657–669;
  47. [21] Dong, M., Wu, C., Hou, F. (2009), Shortest Path Based Simulated Annealing
  48. Algorithm for Dynamic Facility Layout Problem under Dynamic Business
  49. Environment; Expert Systems with Applications, 36, 11221–11232;
  50. [22] Sahin, R., Ertogral, K., Turkbey, O. (2010), A Simulated Annealing Heuristic
  51. for the Dynamic Layout Problem with Budget Constraint; Journal of Computer &
  52. Industrial Engineering, 59, 308-31;
  53. [23] McKendall A.R. and Hakobyan, A. (2010), Heuristics for the Dynamic Facility
  54. Layout Problem with Unequal-area Departments; European Journal of Operational
  55. Research, 201, 171–182;
  56. [24] Azimi, P. and Salehi, M. A. (2011), A Simulation-Based Heuristic for the
  57. Dynamic Facility Layout Problem; International Bulletin of Business Administration,
  58. 11, 112-120;
  59. [25] Umarani, R. et al. (2010), PSO Evolution Overview and Applications;
  60. International Journal of Engineering Science and Technology Vol. 2(7), 2802-2806;
  61. [26] Eberhart, R. Kennedy, J. (1995), A New Optimizer Using Particles Swarm
  62. Theory; Proceedings of the Sixth International Symposium on Micro Machine and
  63. Human Science (Nagoya, Japan),IEEE Service Center, Piscataway, NJ, 39-43;
  64. [27] Eberhart RC., Shi, Y. (2001), Particle Swarm Optimization: Developments,
  65. Applications and Resources; Proceedings of the 2001 Congress on Evolutionary
  66. Computation, 1, 81-86. Piscataway: IEEE Press. [doi: 10.1109/CEC.2001.934374];
  67. [28] Kennedy, J., Eberhart, R.C., (1997), A Discrete Binary Version of the Particle
  68. Swarm Algorithm; Proceedings of World Multi-Conf. on Systemics, Cybernetics and
  69. Informatics, 4104-4109;
  70. [29] Balakrishnan, J., Jacobs, R.F., Venkataramanan, M.A. (1992), Solutions for
  71. the Constrained Dynamic Facility Layout Problem; European Journal of Operations
  72. Research, 57(2):280-286. [doi:10.1016/0377-2217(92)90049-F].

Similar Articles

1-10 of 844

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)