This paper deals with the problem of designing a supply chain network where availability of raw materials is limited and their price and quality vary over time due to their seasonal nature. A multi -echelon supply chain with multiple products and multiple time periods is considered and a Dynamic Mixed - Integer Linear Programming (DMILP) model is developed that integrates and optimizes various aspects of network design including supplier selection, location and size of production and distribution facilities, and quantity of flows along the supply chain, simultaneously. It is assumed that closing/ reopening production plants and distribution centers is possible during the planning horizon. The objective is to maximize total cash value within the supply chain under a constrained budget. A three -stage solution procedure is developed based on Genetic Algorithm (GA) and its efficiency is demonstrated through numerical experiments. The paper discusses specific considerations in optimizing supply chain networks with seasonal raw materials and highlights the benefits of the proposed modeling approach.
References
[1] Azaron, A., Brown, K.N., Tarim, S.A. and Modarres, M. (2008), A Multi-
objective Stochastic Programming Approach for Supply Chain Design
Considering Risk. International Journal of Production Economics, 116,
129-138;
[2] Babazadeh, R., Razmi, J. and Ghodsi, R. (2012) Supply Chain Network
Design Problem for a New Market Opportunity in an Agile Manufacturing
System. Journal of Industrial Engineering International, 8, 1-8;
[3] Cardona-Valdez, Y., Alvarez, A. and Ozdemir, D. (2011), A Bi-Objective
Supply Chain Design Problem with Uncertainty. Transportation Research
Part C: Emerging Technologies, 19, 821-832;
[4] El-Sayed, M., Afia, N. and El-Kharbotly, A. (2010), A Stochastic Model for
Forward-reverse Logistics Network Design under Risk. Computers and
Industrial Engineering, 58, 423-431;
[5] Farahani, R.Z. and Asgari, N. (2007), Combination of MCDM and
Covering Techniques in a Hierarchical Model for Facility Location: A Case
Study. European Journal of Operational Research, 176, 1839-1858;
[6] Hajipour, M.S.V. and Pasandideh, S.H.R. (2012), Proposing an Adaptive
Particle Swarm Optimization for a Novel Bi-objective Queuing Facility
Location Model. Economic Computation and Economic Cybernetics Studies
and Research; ASE Publishing, 46, 223-240;
[7] Koksalan, M. and Sural, H. (1999), Efes Beverage Group Makes Location
and Distribution Decisions for its Malt Plants. Interfaces, 29, 89-103;
[8] Liang, T.F. and Cheng, H.W. (2009), Application of Fuzzy Sets to
Manufacturing/ Distribution Planning Decisions with Multi-product and
Multi-time Period in Supply Chains. Expert Systems with Applications, 36,
3367-3377;
[9] Martel, A. (2005), The Design of Production-distribution Networks: A
Mathematical Programming Approach. In: Geunes, J. and Pardalos, P.M.