Skip to main navigation menu
Skip to main content
Skip to site footer
Admin menu
Register
Login
Main menu
Current
Archives
About
About the Journal
Submissions
Editorial Masthead
Privacy Statement
Contact
Articles
Vol. 8 No. 1 (1973)
The “Duration–Resource” Relation in PERT Type Problems with Resources
I. Văduva
 ▸
 ▾
G. Ciobanu
 ▸
 ▾
Bucharest University Computer Centre
The Department of Economic Cybernetics Academy of Economic Studies
PDF
Submitted
October 24, 2026
Most read articles by the same author(s)
G. Ciobanu,
Characteristics of Feasible Solutions for Project Scheduling Problem
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 15 No. 1 (1981)
I. Văduva,
Some Statistical Considerations Concerning the Reliability Analysis in the Multivariate Case
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 12 No. 4 (1978)
I. Văduva, V. Baltac, V. Florescu, I. Floricică, M. Jitaru,
Software Engineering (II)
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 18 No. 1 (1983)
N. Popoviciu, I. Văduva,
χ²-Test of Goodness of Fit for Multivariate Normal Distribution. Specified Case
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 13 No. 3 (1979)
I. Văduva, V. Baltac, V. Floreșcu, M. Jitaru, I. Floricica,
Future of Electronic Computer Programming
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 19 No. 2 (1984)
I. Văduva,
On the Probability Distribution of the Values of a Distribution Density
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 24 No. 2-3 (1989)
N. Popoviciu, I. Văduva,
χ² Test of Goodness of Fit for Multivariate Normal Distribution. Unspecified Case
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 14 No. 1 (1980)
G. Ciobanu,
A Branch-and-Bound Algorithm to Solve an Assembly Line Balancing Problem
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 11 bis No. 4 (1977)
G. Ciobanu, I. Ciubotaru,
Cybernetic Modelling of the Manufacturing Processes with the Help of the Co-ordinating Graphs
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 19 No. 3 (1984)
G. Ciobanu,
A General Algorithm for Solving Flow Shop Scheduling
,
Economic Computation and Economic Cybernetics Studies and Research: Vol. 10 No. 3 (1975)
<<
<
1
2
3
>
>>
×
Username
*
Required
Password
*
Required
Keep me logged in
Login
Register
Forgot your password?