The solving of the complex problems of production efficient programming implies the establishment of economically most adequate production rates. The notion of rate is conceived conventionally, accepting the static hypothesis according to which no problems of succession and spacing out in time appear, all production capacities at a given moment being supposed available. On the basis of this simplifying hypothesis the following problems can be solved satisfactorily: the establishment of the production rates in the hypothesis of a given plan, with secured resources; the establishment of the production rates when the resource supplying levels are known. The taking into account of the dynamic hypotheses has led to the necessity of adopting Forrester's industrial dynamics techniques which are presented in the last part of the work. The applications were carried out at an enterprise in the electrotechnical machine-building industry.