This paper presents a branch-and-bound algorithm to solve the problem of an assembly line balancing. Based on the notion of feasible set introduced by Gutjahr and Nemhauser, the field of the feasible partitions of the set of operations is explored by lexicographical enumeration. A scheduling program is associated to a partition. To eliminate the partitions which are not potentially optimal, a lower bound of the duration of assembly corresponding to a scheduling program is defined.