The paper presents a proceeding for solving large-scale problems which can not be processed by the available computing configurations and packages. The proceeding is based on decomposition of the large-scale problem into subproblems with reduced dimensions, which will be coordinated by sequential processing which takes into consideration a final goal. For the sake of exemplification a production-scheduling dynamic model is presented, which is decomposed into submodels.