On the Job Shop Scheduling by Mathematical Programming

Submitted
October 24, 2026

Abstract

The authors have introduced in [6] a continuous alternative to the mixed variables objective-function for optimizing the activity of production and allocation analysis taking into account the set-up costs. We build in this paper several models having at their basis this type of objective-function for the job shop scheduling wherein we suppose that the major problems constraints can be linearly modelled.