Qualitative Evaluation of Knowledge Based Model of Project Time-Cost as Decision Making Support

Submitted
October 24, 2026

Abstract

An integral part of effective project management is the knowledge management. Knowledge analyses are based on deep information(equations)or shallow information (verbal description ). The paper presents a quantitative evaluation of qualitative knowledge model . Qualitative quantifications are based on three words (increasing, constant, decreasing).Any qualitative model M has a discrete set of qualitative scenarios S. A n algorithm is used to generate all possible transitions O among the set of S. A transitional graph T has as nodes scenarios S and as arcs transitions O. Any behaviour of the model M can be descr ibed by a sequence of scenarios.A tree R, which is sub-graph of the T graph and can be taken for any qualitative forecasting , is used to evaluate probabilities of different branches of the tree. The presented evaluation provides new knowledge analysis and its main advantage is that no numerical values are needed. The qualitative model shows a seven-dimensional project management problem.

References

  1. [1] Arora, S., Little, M. A., Mcsharry, P. E. (2013), Nonlinear and
  2. Nonparametric Modeling Approaches for Probabilistic Forecasting of the
  3. US Gross National Product;Studies in Nonlinear Dynamics and
  4. Econometrics, 17(4): 395–420;
  5. [2] Aznarte, J. L., Molina, D., Sánchez, A. M., Benítez, J. M. (2011), A Test
  6. for the Homoscedasticity of the Residuals in Fuzzy Rule-Based
  7. Forecasters;Applied Intelligence, 34(3): 386–393;
  8. [3] Babu, L. D. D., Krishna, P. V. (2013), Versatile Time-Cost Algorithm
  9. (VTCA) for Scheduling Non-Preemptive Tasks of Time Critical Workflows
  10. in Cloud Computing Systems;International Journal of Communication
  11. Networks and Distributed Systems, 11(4): 390;
  12. [4] Bentahar, O. (2015), A Sequential and Concurrent Mixed Method Research
  13. in Project Management, in Cassar;V. (ed.) Proceedings of the 14th European
  14. Conference on Research Methodology for Business and Management Studies
  15. (ecrm 2015). Nr Reading: Acad Conferences Ltd, 48–54;
  16. Radek Doskočil, Karel Doubravský
  17. ________________________________________________________________
  18. 279
  19. [5] Bukchin, Y., Rozenes, S. (2011), A Multi-Objective Approach for Decision
  20. Making During the Project Life Cycle;International Journal of Project
  21. Organisation and Management, 3(2): 184;
  22. [6] Deng, P.S. (1993), Automating Knowledge Acquisition and Refinement for
  23. Decision Support: A Connectionist Inductive Inference Model; Decision
  24. Sciences, 24(2): 371–394;
  25. [7] Dhawan, R., O’Connor, M., Borman, M. (2011), The Effect of Qualitative
  26. and Quantitative System Dynamics Training: An Experimental
  27. Investigation;System Dynamics Review, 27(3): 313–327;
  28. [8] Dohnal, M. (1991), A Methodology for Common-Sense Model
  29. Development; Computers in Industry;16(2): 141–158;
  30. [9] Doubravsky, K., Dohnal, M. (2015), Reconciliation of Decision-Making
  31. Heuristics Based on Decision Trees Topologies and Incomplete Fuzzy
  32. Probabilities Sets; PLoS ONE, 10(7): e0131590;
  33. [10] Joslin, R., Müller, R. (2015), Relationships Between a Project Management
  34. Methodology and Project Success in Different Project Governance
  35. Contexts;International Journal of Project Management, 33(6): 1377–1392;
  36. [11] Jugdev, K., Muller, R. (2005), A Retrospective Look at Our Evolving
  37. Understanding of Project Success,available at:
  38. http://auspace.athabascau.ca/handle/2149/277,last accessed 15.09. 2015);
  39. [12] Kosztyan, Z. T., Bencsik, A., Pota, S. (2007), Resource Allocation and Its
  40. Distributed Implementation. Springer;
  41. [13] Mohamed, A., Celik, T. (2000), Knowledge Based-System for Alternative
  42. Design, Cost Estimating and Scheduling; Knowledge-Based System,15
  43. (2002): 177–188;
  44. [14] Orrell, D., Fernandez, E. (2010), Using Predictive Mathematical Models to
  45. Optimise the Scheduling of Anti-Cancer Drugs; Innovations in
  46. Pharmaceutical Technology, 2010(33): 58–62;
  47. [15] Sakellaropoulos, S., Chassiakos, A. P. (2004), Project Time–Cost Analysis
  48. under Generalised Precedence Relations; Advances in Engineering Software,
  49. 35(10, 11): 715–724;
  50. [16] Sears, G. (1981), Cpm-Cost - an Integrated Approach; Journal of the
  51. Construction Division-Asce, 107(2): 227–238;
  52. [17] Serrador, P., Pinto, J. K. (2015), Does Agile work? — A Quantitative
  53. Analysis of Agile Project Success; International Journal of Project
  54. Management, 33(5): 1040–1051;
  55. [18] Takey, S. M., de Carvalho, M. M. (2015), Competency Mapping in Project
  56. Management: An Action Research Study in an Engineering
  57. Company;International Journal of Project Management, 33(4): 784–796;
  58. Qualitative Evaluation of Knowledge Based Model of Project Time-Cost as
  59. Decision Making Support
  60. _______________________________________________________________
  61. 280
  62. [19] Tran, D.H., Cheng, M.Y., Cao, M.-T. (2015), Hybrid Multiple Objective
  63. Artificial Bee Colony with Differential Evolution for the Time-Cost-Quality
  64. Tradeoff Problém; Knowledge-Based Systems, 74: 176–186;
  65. [20] Vicha, T., Dohnal, M. (2008a), Qualitative Feature Extractions of Chaotic
  66. Systems;Chaos, Solitons & Fractals, 38(2): 364–373;
  67. [21] Vicha, T.,Dohnal, M. (2008b), Qualitative Identification of Chaotic Systems
  68. Behaviours;Chaos, Solitons & Fractals, 38(1): 70–78;
  69. [22] Yan, X., Zhou, Y., Wen, Y., Chai, X. (2013), Qualitative and Quantitative
  70. Integrated Modeling for Stochastic Simulation and Optimization; Journal of
  71. Applied Mathematics, 2013: e831273;
  72. [23] Žabkar, J., Možina, M., Bratko, I.,Demšar, J. (2013), Learning Qualitative
  73. Models from Numerical Data; Artificial Intelligence, 175(9, 10): 1604–1619;
  74. [24] Zheng, T., Zhu, L. (2015), Uncertainty Measures of Neighborhood System-
  75. Based Rough Sets; Knowledge-Based Systems, 86: 57–65.

Similar Articles

1-10 of 1526

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)