Qualitative Evaluation of Knowledge Based Model of Project Time-Cost as Decision Making Support
Department of Informatics Faculty of Business and Management Brno University of Technology
Department of Informatics Faculty of Business and Management Brno University of Technology
-
Submitted
-
October 24, 2026
Abstract
An integral part of effective project management is the knowledge management. Knowledge analyses are based on deep information(equations)or shallow information (verbal description ). The paper presents a quantitative evaluation of qualitative knowledge model . Qualitative quantifications are based on three words (increasing, constant, decreasing).Any qualitative model M has a discrete set of qualitative scenarios S. A n algorithm is used to generate all possible transitions O among the set of S. A transitional graph T has as nodes scenarios S and as arcs transitions O. Any behaviour of the model M can be descr ibed by a sequence of scenarios.A tree R, which is sub-graph of the T graph and can be taken for any qualitative forecasting , is used to evaluate probabilities of different branches of the tree. The presented evaluation provides new knowledge analysis and its main advantage is that no numerical values are needed. The qualitative model shows a seven-dimensional project management problem.
References
- [1] Arora, S., Little, M. A., Mcsharry, P. E. (2013), Nonlinear and
- Nonparametric Modeling Approaches for Probabilistic Forecasting of the
- US Gross National Product;Studies in Nonlinear Dynamics and
- Econometrics, 17(4): 395–420;
- [2] Aznarte, J. L., Molina, D., Sánchez, A. M., Benítez, J. M. (2011), A Test
- for the Homoscedasticity of the Residuals in Fuzzy Rule-Based
- Forecasters;Applied Intelligence, 34(3): 386–393;
- [3] Babu, L. D. D., Krishna, P. V. (2013), Versatile Time-Cost Algorithm
- (VTCA) for Scheduling Non-Preemptive Tasks of Time Critical Workflows
- in Cloud Computing Systems;International Journal of Communication
- Networks and Distributed Systems, 11(4): 390;
- [4] Bentahar, O. (2015), A Sequential and Concurrent Mixed Method Research
- in Project Management, in Cassar;V. (ed.) Proceedings of the 14th European
- Conference on Research Methodology for Business and Management Studies
- (ecrm 2015). Nr Reading: Acad Conferences Ltd, 48–54;
- Radek Doskočil, Karel Doubravský
- ________________________________________________________________
- 279
- [5] Bukchin, Y., Rozenes, S. (2011), A Multi-Objective Approach for Decision
- Making During the Project Life Cycle;International Journal of Project
- Organisation and Management, 3(2): 184;
- [6] Deng, P.S. (1993), Automating Knowledge Acquisition and Refinement for
- Decision Support: A Connectionist Inductive Inference Model; Decision
- Sciences, 24(2): 371–394;
- [7] Dhawan, R., O’Connor, M., Borman, M. (2011), The Effect of Qualitative
- and Quantitative System Dynamics Training: An Experimental
- Investigation;System Dynamics Review, 27(3): 313–327;
- [8] Dohnal, M. (1991), A Methodology for Common-Sense Model
- Development; Computers in Industry;16(2): 141–158;
- [9] Doubravsky, K., Dohnal, M. (2015), Reconciliation of Decision-Making
- Heuristics Based on Decision Trees Topologies and Incomplete Fuzzy
- Probabilities Sets; PLoS ONE, 10(7): e0131590;
- [10] Joslin, R., Müller, R. (2015), Relationships Between a Project Management
- Methodology and Project Success in Different Project Governance
- Contexts;International Journal of Project Management, 33(6): 1377–1392;
- [11] Jugdev, K., Muller, R. (2005), A Retrospective Look at Our Evolving
- Understanding of Project Success,available at:
- http://auspace.athabascau.ca/handle/2149/277,last accessed 15.09. 2015);
- [12] Kosztyan, Z. T., Bencsik, A., Pota, S. (2007), Resource Allocation and Its
- Distributed Implementation. Springer;
- [13] Mohamed, A., Celik, T. (2000), Knowledge Based-System for Alternative
- Design, Cost Estimating and Scheduling; Knowledge-Based System,15
- (2002): 177–188;
- [14] Orrell, D., Fernandez, E. (2010), Using Predictive Mathematical Models to
- Optimise the Scheduling of Anti-Cancer Drugs; Innovations in
- Pharmaceutical Technology, 2010(33): 58–62;
- [15] Sakellaropoulos, S., Chassiakos, A. P. (2004), Project Time–Cost Analysis
- under Generalised Precedence Relations; Advances in Engineering Software,
- 35(10, 11): 715–724;
- [16] Sears, G. (1981), Cpm-Cost - an Integrated Approach; Journal of the
- Construction Division-Asce, 107(2): 227–238;
- [17] Serrador, P., Pinto, J. K. (2015), Does Agile work? — A Quantitative
- Analysis of Agile Project Success; International Journal of Project
- Management, 33(5): 1040–1051;
- [18] Takey, S. M., de Carvalho, M. M. (2015), Competency Mapping in Project
- Management: An Action Research Study in an Engineering
- Company;International Journal of Project Management, 33(4): 784–796;
- Qualitative Evaluation of Knowledge Based Model of Project Time-Cost as
- Decision Making Support
- _______________________________________________________________
- 280
- [19] Tran, D.H., Cheng, M.Y., Cao, M.-T. (2015), Hybrid Multiple Objective
- Artificial Bee Colony with Differential Evolution for the Time-Cost-Quality
- Tradeoff Problém; Knowledge-Based Systems, 74: 176–186;
- [20] Vicha, T., Dohnal, M. (2008a), Qualitative Feature Extractions of Chaotic
- Systems;Chaos, Solitons & Fractals, 38(2): 364–373;
- [21] Vicha, T.,Dohnal, M. (2008b), Qualitative Identification of Chaotic Systems
- Behaviours;Chaos, Solitons & Fractals, 38(1): 70–78;
- [22] Yan, X., Zhou, Y., Wen, Y., Chai, X. (2013), Qualitative and Quantitative
- Integrated Modeling for Stochastic Simulation and Optimization; Journal of
- Applied Mathematics, 2013: e831273;
- [23] Žabkar, J., Možina, M., Bratko, I.,Demšar, J. (2013), Learning Qualitative
- Models from Numerical Data; Artificial Intelligence, 175(9, 10): 1604–1619;
- [24] Zheng, T., Zhu, L. (2015), Uncertainty Measures of Neighborhood System-
- Based Rough Sets; Knowledge-Based Systems, 86: 57–65.