Incorporating Flexible Fabrication Rate and Random Scrap into a FPR-Based Supply-Chain System

DOI:
https://doi.org/10.24818/18423264/52.2.18.10
Submitted
October 24, 2026

Abstract

Operating in highly competitive world markets, managers of the present-day manufacturing firms always look for potential means to reduce fabrication cycle length, assure product quality, and trim down shipping expenses in their intra -supply chains. To help accomplish these operation goals, this paper examines a finite production rate (FPR) -based supply -chain system with flexible fabrication rate, random scrap, and multi -ship policy. In which, the manufacture rate in the proposed system is assumes to be adjustable, scrap items are identified and discarded, and fixed-quantity multi-shipment of the finished lot are delivered at a fixed interval of time during production downtime of a cycle. The objective is to determine the optimal lot size and number of shipments that minimize the expected total system costs. Mathematical modeling and Hessian matrix equations are applied to resolve the problem. Applicability of the results is verified via a numerical example. V arious desirable system performances are revealed and become accessible to support managerial decision makings.

References

  1. [1] Taft, E.W. (1918), The Most Economical Production Lot. Iron Age 101,
  2. 1410-1412;
  3. [2] Buzacott, J.A., Ozkarahan, I.A. (1983), One- and Two-Stage Scheduling
  4. of Two Products with Distributed Inserted Idle Time: The Benefits of a
  5. Controllable Production Rate. Naval research logistics quarterly 30(4),
  6. 675-696;
  7. [3] Gallego, G. (1993), Reduced Production Rates in the Economic Lot
  8. Scheduling Problem. International Journal of Production Research 31(5),
  9. 1035-1046;
  10. [4] Eynan, A. (2003), The Benefits of Flexible Production Rates in the
  11. Economic Lot Scheduling Problem. IIE Transactions 35(11), 1057-1064;
  12. [5] Glock, C.H. (2010), Batch Sizing with Controllable Production Rates.
  13. International Journal of Production Research 48(20), 5925-5942;
  14. Incorporating Flexible Fabrication Rate a nd Random Scrap Into A FPR-Based
  15. Supply-Chain System
  16. ______________________________________________________________________
  17. 173
  18. DOI: 10.24818/18423264/52.2.18.10
  19. [6] Farzam Rad, M., Sajadi, S.M., Hosseinzadeh Kashan, A. (2015),
  20. Determination of Optimal Production Rate in Stochastic Manufacturing
  21. Systems by Simulation Optimization Approach. International Journal of
  22. Industrial and Systems Engineering 20(3), 306-322;
  23. [7] Giri, B.C., Dohi, T. (2005), Computational Aspects of an Extended EMQ
  24. Model with Variable Production Rate. Computers and Operations Research
  25. 32(12), 3143-3161;
  26. [8] Sharma, S. (2011), Effects Concerning Quality Level with the Increase in
  27. Production Rate. International Journal of Advanced Manufacturing
  28. Technology 53(5-8), 629-634;
  29. [9] Sajadieh, M.S., Larsen, C. (2015), A Coordinated Manufacturer-Retailer
  30. Model under Stochastic Demand and Production Rate. International
  31. Journal of Production Economics 168, 64-70;
  32. [10] Schwaller, R. (1988), EOQ under Inspection Costs. Production and
  33. Inventory Management, 29, 22-24;
  34. [11] Cheung K. L., Hausman, W. H. (1997), Joint Determination of Preventive
  35. Maintenance and Safety Stocks in an Unreliable Production Environment.
  36. Naval Research Logistics 44(3), 257-272;
  37. [12] Ritvirool, A., Ferrell Jr., W. G . (2007), The Effect on Inventory of
  38. Cooperation in Single-V endor, Single-Buyer Systems with Quality
  39. Considerations. International Journal of Operational Research 2(3),
  40. 338-356;
  41. [13] Chiu, Y-S.P., Chiang, K-W., Chiu, S.W., Song, M-S. (2016), Simultaneous
  42. Determination of Production and Shipment Decisions for a Multi-Product
  43. Inventory System with a Rework Process. Advances in Production
  44. Engineering & Management 11(2), 141-151;
  45. [14] Jindal, P., Solanki, A. (2016), Integrated Supply Chain Inventory Model
  46. with Quality Improvement Involving Controllable Lead Time and
  47. Backorder Price Discount. International Journal of Industrial Engineering
  48. Computations 7(3), 463-480;
  49. [15] Makarova, I., Shubenkova, K., Mavrin, V ., Boyko, A. (2017), Ways to
  50. Increase Sustainibility of the Transportation System. Journal of Applied
  51. Engineering Science 15(1), 89-98;
  52. [16] Michalski, G. (2016), Risk Pressure and Inventories Levels. Influence of
  53. Risk Sensitivity on Working Capital Levels. Economic Computation and
  54. Economic Cybernetics Studies and Research 50(1), 189-196;
  55. [17] Kohli, R., Park, H. (1994), Coordinating Buyer-seller Transactions across
  56. Multiple Products. Management Science 40(9), 45-50;
  57. [18] Sarker, R. A., Khan, L. R. (2001), An Optimal Batch Size under a Periodic
  58. Delivery Policy. International Journal of Systems Science 32(9), 1089-1099;
  59. [19] Giri, B. C., Chakraborty, A. (2011), Supply Chain Coordination for a
  60. Deteriorating Product under Stock- Dependent Consumption Rate and
  61. Unreliable Production Process. International Journal of Industrial
  62. Engineering Computations 2(2), 263-272;
  63. Yuan-Shyi Peter Chiu, Han-Ying Chen, Tiffany Chiu, Singa Wang Chiu
  64. 174
  65. DOI: 10.24818/18423264/52.2.18.10
  66. [20] Cao, J., Chen, Y., Zhou, G . (2015), A Novel Statistical Prediction
  67. Technique Based on the Dynamic Relationship Identification Algorithm to
  68. Forecast Supply Chain Demand. Economic Computation and Economic
  69. Cybernetics Studies and Research 49(1), 203-222;
  70. [21] Chiu, Y-S. P., Kuo, J-S., Chiu, S. W., Hsieh, Y-T. (2016), Effect of Delayed
  71. Differentiation on a Multi–Product V endor–Buyer Integrated Inventory
  72. System with Rework. Advances in Production Engineering & Management
  73. 11(4), 333-344;
  74. [22] Florea, A.I., Corbos, R., Popescu, R.I., Zamfir, A. (2016), From the
  75. Factory Floor to the Shop Floor – Improved Supply Chain for Sustainable
  76. Competitive Advantage with Item-Level RFID in Retail. Economic
  77. Computation and Economic Cybernetics Studies and Research 50(4),
  78. 119-134;
  79. [23] Khalili, A., Ismail, M. Y., Karim, A. N. M., Che Daud, M. R. (2017),
  80. Critical Success Factors for Soft TQM and Lean Manufacturing Linkage.
  81. Jordan Journal of Mechanical and Industrial Engineering 11(2), 129-140;
  82. [24] Chiu, S.W., Liu, C.-J., Li, Y.-Y., Chou, C.-L. (2017), Manufacturing Lot
  83. Size and Product Distribution Problem with Rework, Outsourcing and
  84. Discontinuous Inventory Distribution Policy. International Journal for
  85. Engineering Modelling 30(1-4), 49-61;
  86. [25] Rardin, R. L. (1998), Optimization in Operations Research. Prentice-Hall,
  87. New Jersey, 739-741.

Similar Articles

1-10 of 2473

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)