A Robust Optimization Model for Multi-Product Production Planning in Terms of Uncertainty of Demand and Delivery Time

DOI:
https://doi.org/10.24818/18423264/52.4.18.15
Submitted
October 24, 2026

Abstract

Production planning in the uncertainty conditions is one of the inherent characteristics of manufacturing environments. In this paper, a new multi -product multi -stage production planning model is presented. The demand and delivery time are considered to be uncertain. In order to deal with non -deterministic parameters and reduce their impact on optimal solution, a robust opt imization model with a description of the scenario of uncertainty data has been used. The objective is to minimize the cost over the planning horizon. To solve the proposed model, The Branch and Bound (B&B) method is used by using Lingo software.

References

  1. [1] Wang, R. and H. Fang (2000), Aggregate Production Planning in a
  2. Fuzzy Environment. International Journal of Industrial Engineering-
  3. Theory, Applications and Practice, 7(1): pp. 5-14;
  4. [2] Leung, S., Y. Wu and K. Lai (2006), A Stochastic Programming
  5. Approach for Multi-site Aggregate Production Planning. Journal of the
  6. Operational Research Society, 57(2): pp. 123-132;
  7. [3] Ramezanian, R., D. Rahmani and F. Barzinpour(2012), An Aggregate
  8. Production Planning Model for Two Phase Production Systems: Solving
  9. with Genetic Algorithm and Tabu Search. Expert Systems with
  10. Applications, 39(1): pp. 1256-1263;
  11. [4] Leung, S.C. and Y. Wu (2004), A Robust Optimization Model for
  12. Stochastic Aggregate Production Planning. Production planning &
  13. control, 15(5): pp. 502-514;
  14. [5] Kastsian, D. and M. Mönnigmann(2014), Robust Optimization of
  15. Periodically Operated Nonlinear Uncertain Processes. Chemical
  16. Engineering Science, 106: pp. 109-118;
  17. [6] Sakhaii, M., et al. (2016), A Robust Optimization Approach for an
  18. Integrated Dynamic Cellular Manufacturing System and Production
  19. Planning with Unreliable Machines. Applied Mathematical Modelling,
  20. 40(1): pp. 169-191;
  21. [7] Mulvey, J.M., R.J. Vanderbei and S.A. Zenios(1995), Robust
  22. Optimization of Large-scale Systems. Operations research, 43(2):
  23. pp. 264-281.

Similar Articles

1-10 of 865

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)