Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 52 No. 4 (2018)

A Bi-objective Mathematical Model for Inventory-Distribution-Routing Problem under Risk Pooling Effect: Robust Meta-Heuristics Approach

DOI:
https://doi.org/10.24818/18423264/52.4.18.17
Submitted
October 24, 2026

Abstract

In this paper, a bi -objective model is proposed to study Location - Routing-Inventory (LRI) problem considering risk pooling and soft time window. The first objective function aims to minimize the costs of establishing Distribution Centers (DCs), transportation, ordering, and inventory holding; the second one minimizes the earliness and lateness of vehicles. Considering the large -scale instances of this problem is NP-Hard, three meta-heuristic algorithms, such as NSGA-II, MOPSO, and Pareto Envelope -based Selection Algorithm (PESA) -II, are proposed . These algorithms are compared, and NSGA-II outperforms the other algorithms. Afterward, the proposed NSGA -II is compared with the exact method. The computational results show that the exact method only outperforms this algorithm with around 6% gap in the first objective function on average. Eventually, a sensitivity analysis has been conducted with respect to the number of DCs and vehicles. This shows that total costs, and total earliness and lateness increase and decrease in both cases, respectively.

References

  1. [1]Ahmadi-Javid, A. & Seddighi, A. H. (2012), A Location-Routing-Inventory
  2. Model for Designing Multisource Distribution Networks. Engineering Optimization,
  3. 44(6), 637-656;
  4. [2]Ahmadi-Javid, A. & Azad, N. (2010), Incorporating Location, Routing and
  5. Inventory Decisions in Supply Chain Network Design. Transportation Research Part
  6. E: Logistics and Transportation Review, 46(5), 582-597;
  7. A Bi-Objective Mathematical Model for Inventory-Distribution-Routing Problem
  8. Under Risk Pooling Effect: Robust Meta-Heuristics Approach
  9. _____________________________________________________________________
  10. 273
  11. [3]Chen, M.-S. & Lin, C.-T. (1989),Effects of Centralization on Expected Costs in a
  12. Multi-Location Newsboy Problem. Journal of the Operational Research Society,
  13. 40(6), 597-602;
  14. [4]Coello, C. A. C., Pulido, G. T. & Lechuga, M. S. (2004), Handling Multiple
  15. Objectives with Particle Swarm Optimization. IEEE transactions on Evolutionary
  16. Computation, 8(3), 256-279;
  17. [5]Deb, K., Agrawal, S., Pratap, A. & Meyarivan, T. (2000), A Fast Elitist Non-
  18. Dominated Sorting Genetic Algorithm for Multi-Objective Optimization: NSGA-II.
  19. Paper presented at the International Conference on Parallel Problem Solving From
  20. Nature;
  21. [6]Deb, K., Pratap, A., Agarwal, S. & Meyarivan, T. (2002), A Fast and Elitist
  22. Multiobjective Genetic Algorithm: NSGA-II. IEEE transactions on Evolutionary
  23. Computation, 6(2), 182-197;
  24. [7]Dehghani, E. & Jabalameli, M. S. (2017), Optimizing Location, Routing and
  25. Inventory Decisions in an Integrated Supply Chain Network Under Uncertainty.
  26. Journal of Industrial and Systems Engineering, 9(4), 93-111;
  27. [8]Eppen, G. D. (1979), Note—Effects of Centralization on Expected Costs in a
  28. Multi-Location Newsboy Problem. Management Science, 25(5), 498-501;
  29. [9]Gaur, S. & Ravindran, A. R. (2006), A Bi-Criteria Model for the Inventory
  30. Aggregation Problem under Risk Pooling. Computers & Industrial Engineering,
  31. 51(3), 482-501;
  32. [10]Kang, J.-H. & Kim, Y.-D. (2012), Inventory Control in a Two-Level Supply
  33. Chain With Risk Pooling Effect. International Journal of Production Economics,
  34. 135(1), 116-124;
  35. [11]Kumar, S. K. & Tiwari, M. (2013), Supply Chain System Design Integrated
  36. with Risk Pooling. Computers & Industrial Engineering, 64(2), 580-588;
  37. [12]Low, C., Li, R.-K. & Chang, C.-M. (2013), Integrated Scheduling of
  38. Production and Delivery with Time Windows. International Journal of Production
  39. Research, 51(3), 897-909;
  40. [13]Moradi, H., Zandieh, M. & Mahdavi, I. (2011), Non-dominated Ranked
  41. Genetic Algorithm for a Multi-Objective Mixed-Model Assembly Line Sequencing
  42. Problem. International Journal of Production Research, 49(12), 3479-3499;
  43. [14]Nekooghadirli, N., Tavakkoli-Moghaddam, R., Ghezavati, V. R., &
  44. Javanmard, S. (2014), Solving a New Bi-Objective Location-Routing-Inventory
  45. Problem in a Distribution Network By Meta-Heuristics. Computers & Industrial
  46. Engineering, 76, 204-221;
  47. Mohammad Momenikiyai, Sadoullah Ebrahimnejad, Behnam Vahdani
  48. ____________________________________________________________________
  49. 274
  50. [15]Park, S., Lee, T.-E. & Sung, C. S. (2010), A Three-level Supply Chain Network
  51. Design Model with Risk-Pooling and Lead Times. Transportation Research Part E:
  52. Logistics and Transportation Review, 46(5), 563-581.
  53. [16]Schmitt, A. J., Sun, S. A., Snyder, L. V. & Shen, Z.-J. M. (2015),Centralization
  54. versus Decentralization: Risk Pooling, Risk Diversification, and Supply Chain
  55. Disruptions. Omega, 52, 201-212;
  56. [17]Soni, N. & Kumar, T. (2014), Study of Various Mutation Operators in Genetic
  57. Algorithms. International Journal of Computer Science and Information Technologies,
  58. 5(3), 4519-4521;
  59. [18]Tavakkoli-Moghaddam, R., Azarkish, M. & Sadeghnejad-Barkousaraie, A.
  60. (2011) , A New Hybrid Multi-Objective Pareto Archive PSO Algorithm for a Bi-
  61. Objective Job Shop Scheduling Problem. Expert Systems with Applications, 38(9),
  62. 10812-10821;
  63. [19]Tavakkoli-Moghaddam, R., Forouzanfar, F. & Ebrahimnejad, S. (2013),
  64. Incorporating Location, Routing, and Inventory Decisions in a Bi-Objective Supply
  65. Chain Design Problem with Risk-Pooling. Journal of Industrial Engineering
  66. International, 9(1), 19;
  67. [20]Vahdani, B., Niaki, S. &Aslanzade, S. (2017), Production-Inventory-Routing
  68. Coordination with Capacity and Time Window Constraints for Perishable Products:
  69. Heuristic and Meta-heuristic Algorithms. Journal of Cleaner Production;
  70. [21]Yan, S., Chu, J. C., Hsiao, F.-Y. & Huang, H.-J. (2015), A Planning Model and
  71. Solution Algorithm for Multi-Trip Split-Delivery Vehicle Routing and Scheduling
  72. Problems with Time Windows. Computers & Industrial Engineering, 87, 383-393;
  73. [22]Zhang, Y., Snyder, L. V., Qi, M. & Miao, L. (2016), A Heterogeneous Reliable
  74. Location Model with Risk Pooling under Supply Disruptions. Transportation
  75. Research Part B: Methodological, 83, 151-178;
  76. [23]Zhong, Y. & Cole, M. H. (2005), A Vehicle Routing Problem with Backhauls
  77. and Time Windows: A Guided Local Search Solution. Transportation Research Part
  78. E: Logistics and Transportation Review,41(2), 131-144.

Similar Articles

11-20 of 642

You may also start an advanced similarity search for this article.