A resource renting problem is a project scheduling problem in which the required resources should be rented, and the goal is to find a schedule and resource renting plan such that the total cost of the resources minimises. Traditionally, the model of a resource renting problem contains single-mode activities and a single objective function. This research aims to present a new mathematical model for a bi -objective multi- mode resource renting problem. The objectives are to minimis e the project makespan and also the total c ost of resources, including the time -independent resource procurement costs and time -dependent resource renting costs, simultaneously. A novel evolutionary algorithm, namely the Multi - Objective Water Cycle Algorithm (MOWCA), is employed to solve this NP-hard problem. In order to evaluate the proposed algorithm, the Non- Dominated Sorting Genetic Algorithm (NSGA-II) is applied, too. A set of instances is selected from the digital library of project scheduling problems to analyse the performances of evolutionary algorithms. The results of the experimentation are quite satisfactory.
References
[1] Afshar-Nadjafi, B., Basati, M., Maghsoudlou, H. (2017) , Project scheduling for
minimizing temporary availability cost of rental resources and tardiness penalty of
activities. Applied Soft Computing, 61, 536-548.
[2] Arjmand, M., Najafi, A.A., Ebrahimzadeh M. (2020) , Evolutionary algorithms for