Articles
Vol. 53 No. 3 (2019)
Exploration of a Multi-Product EPQ-Based System with Overtime and Quality Reassurance
Dept. of Business Administration, Chaoyang University of Technology Taichung ,Taiwan
Dept. of Business Administration, Chaoyang University of Technology Taichung ,Taiwan
Dept. of Industrial Engineering & Management, Chaoyang University of Technology, Taichung ,Taiwan
Dept. of Marketing & Logistics Management, Chaoyang University of Technology, Taichung , Taiwan
Abstract
In contemporary global marketplaces, buyers demand has to be satisfied with the timely provision of multiple products. Further, in real manufacturing settings, fabrication of imperfect items is inevitable owing to unanticipated iss ues; these items must be identified, separated, reworked or scrapped to keep product quality at the desired level. To cope with all these issues, producers must be able to make a flexible manufacturing plan that not only meets buyers’ multi-product needs on time with perfect quality goods, but also has smooth fabrication schedules. Overtime is an effective alternative for increasing output rate and reducing completion time in batch production. Seeking to assist in production planning, this study explores a multi-product economic production quantity-based system with overtime and product quality reassurance, with the objective of finding the optimal stock refilling policy that minimizes total system cost. Mathematical technique s are employed to develop a prec ise model to represent the problem, find the total system cost, and determine a closed -form optimal common cycle length. A numerical illustration is provided to demonstrate that our model can reveal: (i) the influence of the variation in overtime -related factors on the system’s variable cost, utilization, and total cost; (ii) the impact of difference in factors related to product quality on total system cost; and (iii) the combined impacts of changes in overtime and quality-related factors on various system parameters. Our investigation provides insights on system-related information that supports the planning and controlling functions of a real istic system.
References
- [1] Vergin, R., Lee, T. (1978), Scheduling Rules for the Multiple Product
- Single Machine System with Stochastic Demand. Information Systems and
- Operational Research 16(1), 64-73;
- [2] Günther, H.O. (1988), Numerical Evaluation of Heuristics for the
- Multi-Item Single-Level Capacitated Lot-Size Problem. Engineering Costs
- and Production Economics 14(3), 233-243;
- [3] Sox, C.R., Muckstadt, J.A. (1996), Multi-Item, Multi-Period Production
- Planning with Uncertain Demand. IIE Transactions 28(11), 891-900;
- [4] Absi, N., Kedad-Sidhoum, S. (2009), The Multi-Item Capacitated
- Lot-Sizing Problem with Safety Stocks and Demand Shortage Costs.
- Computers and Operations Research 36(11), 2926-2936;
- [5] Rahmani, D., Ramezanian, R., Fattahi, P., Heydari, M. (2013), A Robust
- Optimization Model for Multi-Product Two-Stage Capacitated Production
- Planning Under Uncertainty. Applied Mathematical Modelling 37(20-21),
- 8957-8971;
- [6] Jawla, P., Singh, S.R. (2016), Multi-Item Economic Production Quantity
- Model for Imperfect Items with Multiple Production Setups and Rework
- under the Effect of Preservation Technology and Learning Environment.
- International Journal of Industrial Engineering Computations 7(4),
- 703-716;
- [7] Chiu, S.W., Hsieh, Y-T., Chiu, Y-S.P., Hwang, M-H. (2016), A Delayed
- Differentiation Multi-Product FPR Model with Scrap and a Multi-Delivery
- Policy – II: Using Two-Machine Production Scheme. International Journal
- for Engineering Modelling 29(1-4), 53-68;
- [8] Razmi, J., Kazerooni, M.P., Sangari, M.S. (2016), Designing an
- Integrated Multi-Echelon, Multi-Product and Multi-Period Supply Chain
- Network with Seasonal Raw Materials. Economic Computation and
- Economic Cybernetics Studies and Research 50(1),ASE Publishing 273-290;
- [9] Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., Halim, A.H. (2016),
- Integrated Batch Production and Maintenance Scheduling for Multiple
- Items Processed on a Deteriorating Machine to Minimize Total Production
- and Maintenance Costs with Due Date Constraint. International Journal of
- Industrial Engineering Computations 7(2), 229-244;
- [10] Chiu, Y-S.P., Liu, C-J., Hwang, M-H. (2017), Optimal Batch Size
- Considering Partial Outsourcing Plan and Rework. Jordan Journal of
- Mechanical and Industrial Engineering 11(3), 195-200;
- Exploration of a Multi-Product EPQ-Based System with Overtime and Quality
- Reassurance
- __________________________________________________________________
- 93
- DOI: 10.24818/18423264/53.3.19.05
- [11] Vujosevic, M., Makajic-Nikolic, D., Pavlovic, P. (2017), A New Approach
- to Determination of the Most Critical Multi-State Components in
- Multi-State Systems. Journal of Applied Engineering Science 15(4),
- 401-405;
- [12] Chiu, Y.-S.P., Lin, H.-D., Wu, M.-F., Chiu, S.W. (2018), Alternative
- Fabrication Scheme to Study Effects of Rework of Nonconforming
- Products and Delayed Differentiation on a Multiproduct Supply-Chain
- System. International Journal of Industrial Engineering Computations 9(2),
- 235-248;
- [13] Conley, W. (1985), Production Scheduling with Overtime Considerations.
- International Journal on Policy and Information 9(1), 149-157;
- [14] Shiftan, Y., Wilson, N.H.M. (1994), Absence, Overtime, and Reliability
- Relationships in Transit Workforce Planning. Transportation Research Part
- A 28(3), 245-258;
- [15] Schank, T. (2005), Are Overtime Plants More Efficient than
- Standard-Time Plants? A Stochastic Production Frontier Analysis Using
- The IAB Establishment Panel. Empirical Economics 30(3), 693-710;
- [16] Campbell, G .M. (2012), On-Call Overtime for Service Workforce
- Scheduling when Demand Is Uncertain. Decision Sciences 43(5), 817-850;
- [17] Chiu, S.W., Lin, H-D., C-L. Chou, Chiu, Y-S.P. (2018), Mathematical
- Modeling for Exploring the Effects of Overtime Option, Rework, and
- Discontinuous Inventory Issuing Policy on EMQ Model. International
- Journal of Industrial Engineering Computations 9(4), 479-490;
- [18] Liu, Y., Wu, H., Hou, J., Wei, C., Ren, W. (2017), An Injection/Production
- Rate Allocation Method Applied for Polymer-Surfactant Flooding. Journal
- of Engineering Research 5(2), 250-267;
- [19] Chiu, S.W., Wu, H-Y., Chiu, Y-S.P., Hwang, M-H. (2018), Exploration of
- Finite Production Rate Model with Overtime and Rework of
- Nonconforming Products. Journal of King Saud University - Engineering
- Sciences 30(3), 224-231;
- [20] Gopalan, M.N., Kannan, S. (1994), Expected Duration Analysis of a
- Two-Stage Transfer-Line Production System Subject to Inspection and
- Rework. Journal of the Operational Research Society 45(7), 797-805;
- [21] Grosfeld-Nir, A., Gerchak, Y. (2002), Multistage Production to Order
- with Rework Capability. Management Science 48(5), 652-664;
- [22] Sarker, B.R., Jamal, A.M.M., Mondal, S. (2008), Optimal Batch Sizing in
- a Multi-Stage Production System with Rework Consideration. European
- Journal of Operational Research 184(3), 915-929;
- [23] Chiu, Y-S.P., Hsieh, Y-T., Kuo, J-S. Chiu, S.W. (2016), A Delayed
- Differentiation Multi-Product FPR Model with Scrap and a Multi-Delivery
- Policy – I: Using Single-Machine Production Scheme. International
- Journal for Engineering Modelling 29(1-4), 37-52;
- [24] Kaylani, H., Almuhtady, A., Atieh, A.M. (2016), Novel Approach to
- Enhance the Performance of Production Systems Using Lean Tools.
- Jordan Journal of Mechanical and Industrial Engineering 10(3), 215-229;
- Singa Wang Chiu, Chung-Li Chou, Hong-Dar Lin, Ming-Hon Hwang
- _________________________________________________________________
- 94
- DOI: 10.24818/18423264/53.3.19.05
- [25] Abubakar, M., Basheer, U., Ahmad, N. (2017), Mesoporosity,
- Thermochemical and Probabilistic Failure Analysis of Fired Locally
- Sourced Kaolinitic Clay. Journal of the Association of Arab Universities for
- Basic and Applied Sciences 24, 81-88;
- [26] Chiu, S.W., Liu, C.-J., Chen, Y.-R., Peter Chiu, Y.-S. (2017), Finite
- Production Rate Model with Backlogging, Service Level Constraint,
- Rework, and Random Breakdown. International Journal for Engineering
- Modelling 30(1-4), 63-80;
- [27] Khalili, A., Ismail, M.Y., Karim, A.N.M., Che Daud, M.R. (2017),
- Critical Success Factors for Soft TQM and Lean Manufacturing Linkage.
- Jordan Journal of Mechanical and Industrial Engineering 11(2), 129-140;
- [28] Chiu, Y.-S.P., Chen, H.-Y., Chiu, T., Chiu, S.W. (2018), Incorporating
- Flexible Fabrication Rate and Random Scrap into a FPR-Based
- Supply-Chain System. Economic Computation and Economic Cybernetics
- Studies and Research 52(2),ASE Publishing, 157-174;
- [29] Saari, J., Odelius, J. (2018), Detecting Operation Regimes Using
- Unsupervised Clustering with Infected Group Labelling to Improve
- Machine Diagnostics and Prognostics. Operations Research Perspectives 5,
- 232-244;
- [30] Nahmias, S. (2009), Production and Operations Analysis. McGraw-Hill Co.
- Inc., New York.