Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 53 No. 3 (2019)

Exploration of a Multi-Product EPQ-Based System with Overtime and Quality Reassurance

DOI:
https://doi.org/10.24818/18423264/53.3.19.05
Submitted
October 24, 2026

Abstract

In contemporary global marketplaces, buyers demand has to be satisfied with the timely provision of multiple products. Further, in real manufacturing settings, fabrication of imperfect items is inevitable owing to unanticipated iss ues; these items must be identified, separated, reworked or scrapped to keep product quality at the desired level. To cope with all these issues, producers must be able to make a flexible manufacturing plan that not only meets buyers’ multi-product needs on time with perfect quality goods, but also has smooth fabrication schedules. Overtime is an effective alternative for increasing output rate and reducing completion time in batch production. Seeking to assist in production planning, this study explores a multi-product economic production quantity-based system with overtime and product quality reassurance, with the objective of finding the optimal stock refilling policy that minimizes total system cost. Mathematical technique s are employed to develop a prec ise model to represent the problem, find the total system cost, and determine a closed -form optimal common cycle length. A numerical illustration is provided to demonstrate that our model can reveal: (i) the influence of the variation in overtime -related factors on the system’s variable cost, utilization, and total cost; (ii) the impact of difference in factors related to product quality on total system cost; and (iii) the combined impacts of changes in overtime and quality-related factors on various system parameters. Our investigation provides insights on system-related information that supports the planning and controlling functions of a real istic system.

References

  1. [1] Vergin, R., Lee, T. (1978), Scheduling Rules for the Multiple Product
  2. Single Machine System with Stochastic Demand. Information Systems and
  3. Operational Research 16(1), 64-73;
  4. [2] Günther, H.O. (1988), Numerical Evaluation of Heuristics for the
  5. Multi-Item Single-Level Capacitated Lot-Size Problem. Engineering Costs
  6. and Production Economics 14(3), 233-243;
  7. [3] Sox, C.R., Muckstadt, J.A. (1996), Multi-Item, Multi-Period Production
  8. Planning with Uncertain Demand. IIE Transactions 28(11), 891-900;
  9. [4] Absi, N., Kedad-Sidhoum, S. (2009), The Multi-Item Capacitated
  10. Lot-Sizing Problem with Safety Stocks and Demand Shortage Costs.
  11. Computers and Operations Research 36(11), 2926-2936;
  12. [5] Rahmani, D., Ramezanian, R., Fattahi, P., Heydari, M. (2013), A Robust
  13. Optimization Model for Multi-Product Two-Stage Capacitated Production
  14. Planning Under Uncertainty. Applied Mathematical Modelling 37(20-21),
  15. 8957-8971;
  16. [6] Jawla, P., Singh, S.R. (2016), Multi-Item Economic Production Quantity
  17. Model for Imperfect Items with Multiple Production Setups and Rework
  18. under the Effect of Preservation Technology and Learning Environment.
  19. International Journal of Industrial Engineering Computations 7(4),
  20. 703-716;
  21. [7] Chiu, S.W., Hsieh, Y-T., Chiu, Y-S.P., Hwang, M-H. (2016), A Delayed
  22. Differentiation Multi-Product FPR Model with Scrap and a Multi-Delivery
  23. Policy – II: Using Two-Machine Production Scheme. International Journal
  24. for Engineering Modelling 29(1-4), 53-68;
  25. [8] Razmi, J., Kazerooni, M.P., Sangari, M.S. (2016), Designing an
  26. Integrated Multi-Echelon, Multi-Product and Multi-Period Supply Chain
  27. Network with Seasonal Raw Materials. Economic Computation and
  28. Economic Cybernetics Studies and Research 50(1),ASE Publishing 273-290;
  29. [9] Zahedi, Z., Ari Samadhi, T.M.A., Suprayogi, S., Halim, A.H. (2016),
  30. Integrated Batch Production and Maintenance Scheduling for Multiple
  31. Items Processed on a Deteriorating Machine to Minimize Total Production
  32. and Maintenance Costs with Due Date Constraint. International Journal of
  33. Industrial Engineering Computations 7(2), 229-244;
  34. [10] Chiu, Y-S.P., Liu, C-J., Hwang, M-H. (2017), Optimal Batch Size
  35. Considering Partial Outsourcing Plan and Rework. Jordan Journal of
  36. Mechanical and Industrial Engineering 11(3), 195-200;
  37. Exploration of a Multi-Product EPQ-Based System with Overtime and Quality
  38. Reassurance
  39. __________________________________________________________________
  40. 93
  41. DOI: 10.24818/18423264/53.3.19.05
  42. [11] Vujosevic, M., Makajic-Nikolic, D., Pavlovic, P. (2017), A New Approach
  43. to Determination of the Most Critical Multi-State Components in
  44. Multi-State Systems. Journal of Applied Engineering Science 15(4),
  45. 401-405;
  46. [12] Chiu, Y.-S.P., Lin, H.-D., Wu, M.-F., Chiu, S.W. (2018), Alternative
  47. Fabrication Scheme to Study Effects of Rework of Nonconforming
  48. Products and Delayed Differentiation on a Multiproduct Supply-Chain
  49. System. International Journal of Industrial Engineering Computations 9(2),
  50. 235-248;
  51. [13] Conley, W. (1985), Production Scheduling with Overtime Considerations.
  52. International Journal on Policy and Information 9(1), 149-157;
  53. [14] Shiftan, Y., Wilson, N.H.M. (1994), Absence, Overtime, and Reliability
  54. Relationships in Transit Workforce Planning. Transportation Research Part
  55. A 28(3), 245-258;
  56. [15] Schank, T. (2005), Are Overtime Plants More Efficient than
  57. Standard-Time Plants? A Stochastic Production Frontier Analysis Using
  58. The IAB Establishment Panel. Empirical Economics 30(3), 693-710;
  59. [16] Campbell, G .M. (2012), On-Call Overtime for Service Workforce
  60. Scheduling when Demand Is Uncertain. Decision Sciences 43(5), 817-850;
  61. [17] Chiu, S.W., Lin, H-D., C-L. Chou, Chiu, Y-S.P. (2018), Mathematical
  62. Modeling for Exploring the Effects of Overtime Option, Rework, and
  63. Discontinuous Inventory Issuing Policy on EMQ Model. International
  64. Journal of Industrial Engineering Computations 9(4), 479-490;
  65. [18] Liu, Y., Wu, H., Hou, J., Wei, C., Ren, W. (2017), An Injection/Production
  66. Rate Allocation Method Applied for Polymer-Surfactant Flooding. Journal
  67. of Engineering Research 5(2), 250-267;
  68. [19] Chiu, S.W., Wu, H-Y., Chiu, Y-S.P., Hwang, M-H. (2018), Exploration of
  69. Finite Production Rate Model with Overtime and Rework of
  70. Nonconforming Products. Journal of King Saud University - Engineering
  71. Sciences 30(3), 224-231;
  72. [20] Gopalan, M.N., Kannan, S. (1994), Expected Duration Analysis of a
  73. Two-Stage Transfer-Line Production System Subject to Inspection and
  74. Rework. Journal of the Operational Research Society 45(7), 797-805;
  75. [21] Grosfeld-Nir, A., Gerchak, Y. (2002), Multistage Production to Order
  76. with Rework Capability. Management Science 48(5), 652-664;
  77. [22] Sarker, B.R., Jamal, A.M.M., Mondal, S. (2008), Optimal Batch Sizing in
  78. a Multi-Stage Production System with Rework Consideration. European
  79. Journal of Operational Research 184(3), 915-929;
  80. [23] Chiu, Y-S.P., Hsieh, Y-T., Kuo, J-S. Chiu, S.W. (2016), A Delayed
  81. Differentiation Multi-Product FPR Model with Scrap and a Multi-Delivery
  82. Policy – I: Using Single-Machine Production Scheme. International
  83. Journal for Engineering Modelling 29(1-4), 37-52;
  84. [24] Kaylani, H., Almuhtady, A., Atieh, A.M. (2016), Novel Approach to
  85. Enhance the Performance of Production Systems Using Lean Tools.
  86. Jordan Journal of Mechanical and Industrial Engineering 10(3), 215-229;
  87. Singa Wang Chiu, Chung-Li Chou, Hong-Dar Lin, Ming-Hon Hwang
  88. _________________________________________________________________
  89. 94
  90. DOI: 10.24818/18423264/53.3.19.05
  91. [25] Abubakar, M., Basheer, U., Ahmad, N. (2017), Mesoporosity,
  92. Thermochemical and Probabilistic Failure Analysis of Fired Locally
  93. Sourced Kaolinitic Clay. Journal of the Association of Arab Universities for
  94. Basic and Applied Sciences 24, 81-88;
  95. [26] Chiu, S.W., Liu, C.-J., Chen, Y.-R., Peter Chiu, Y.-S. (2017), Finite
  96. Production Rate Model with Backlogging, Service Level Constraint,
  97. Rework, and Random Breakdown. International Journal for Engineering
  98. Modelling 30(1-4), 63-80;
  99. [27] Khalili, A., Ismail, M.Y., Karim, A.N.M., Che Daud, M.R. (2017),
  100. Critical Success Factors for Soft TQM and Lean Manufacturing Linkage.
  101. Jordan Journal of Mechanical and Industrial Engineering 11(2), 129-140;
  102. [28] Chiu, Y.-S.P., Chen, H.-Y., Chiu, T., Chiu, S.W. (2018), Incorporating
  103. Flexible Fabrication Rate and Random Scrap into a FPR-Based
  104. Supply-Chain System. Economic Computation and Economic Cybernetics
  105. Studies and Research 52(2),ASE Publishing, 157-174;
  106. [29] Saari, J., Odelius, J. (2018), Detecting Operation Regimes Using
  107. Unsupervised Clustering with Infected Group Labelling to Improve
  108. Machine Diagnostics and Prognostics. Operations Research Perspectives 5,
  109. 232-244;
  110. [30] Nahmias, S. (2009), Production and Operations Analysis. McGraw-Hill Co.
  111. Inc., New York.

Similar Articles

71-80 of 2431

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)