Fuzzy Multi Objective Project Scheduling under Inflationary Conditions

Submitted
October 24, 2026

Abstract

Project scheduling is a major area of project management and planning. Due to the increasing prices of goods in most countries during the project and lack of information related to each parameters and variables, using fuzzy sets under inflationary condition can be efficient. In this paper , fuzzy project scheduling when project’s revenues and costs are increased by different i nflationary rate is considered. The duration of each project’s activity is assumed as a fuzzy number. Two objectives of the problem are to minimize the project duration and to maximize the net present value of the project. The nonlinear multi-objective model will be solved by one of the multi - objective decision makin g methods named LP -Metric method and Frank -Wolf algorithm as one of the nonlinear programming procedure. The solving approach will be explained in a numerical example and the computational results will be reported.

References

  1. [1] Chanas, S., Kamburowski, J. (1981), The Use of Fuzzy Variables in PERT.
  2. Fuzzy Sets and Systems, 5(1), 11-19;
  3. [2] Demeulemeester, E., Herroelen, W. (2002), Project Scheduling: A Research
  4. Handbook. Kluwer Academic Publishers. Boston, USA;
  5. [3] Fathallahi, F., Najafi, A.A. (2013), A Multi-Objective Approach Based on
  6. Frank-Wolf Algorithm for Fully Fuzzy Project Scheduling with Discounted
  7. Cash Flows. Technical Journal of Engineering and Applied Sciences. 3(22),
  8. 3076-3084;
  9. [4] Girinold, R.C. (1972), The Payment Scheduling Problem. Naval Research
  10. Logistics Quarterly, 19(1), 123-136;
  11. [5] Herroelen.W., Lesus, R. (2005), Project Scheduling under Uncertainty:
  12. Survey and Research Potentials. European Journal of Operational Research,
  13. 33(3), 289-306;
  14. [6] Jolayemi, K., Oluleye, A.E. (1993), Scheduling of Projects under the
  15. Condition of Inflation. International Journal of Management Science, 21(4),
  16. 481-487;
  17. [7] Ke, H., Liu, B. (2005), Project Scheduling Problem with Stochastic Activity
  18. Duration Times. Applied Mathematics and Computation, 168(1), 342-353;
  19. Fatemeh Azimi, Fatemeh Fathallahi
  20. ___________________________________________________________________
  21. 350
  22. [8] Kelley, J.E. (1961), Critical Path Planning and Scheduling: Mathematical
  23. Basic. Operations Research, 9(3), 296-320;
  24. [9] Malcom,D.G., Roseboom,J.H., Clark, C.E., Fazar, W. (1951), Application
  25. of a Technique for Research and Development Program Evaluation. Operations
  26. Research, 7(5), 646-669;
  27. [10] Nasution, S.H.(1994), Fuzzy Critical Path Method; IEEE Transactions on
  28. Systems. Man. and Cybernetics, 24(1), 48-57;
  29. [11] Najafi, A.A., Esfandiari, N., Azimi, F. (2009), Maximizing the Net Present
  30. Value of a Project under Inflationary Conditions. Economic Computation and
  31. Economic Cybernetics Studies and Research; 43(4), 144-156;
  32. [12] Russell, A.H. (1972), Cash Flows in Network. Management Science, 16(5),
  33. 357-373;
  34. [13] Tilson, V., Sobel, M.J., Szmerekovsky, J.G. (2009), Scheduling Projects
  35. with Stochastic Activity Duration to Maximize EPV. European Journal of
  36. Operational Research, 198(3), 697-705;
  37. [14] Verderame, P.M., Elia, J.A., Li, J., Floudas, C.A. (2010), Planning and
  38. Scheduling under Uncertainty: A Review Across Multiple Sectors. Industrial and
  39. Engineering Chemistry Research, 49(9), 3993–4017;
  40. [15] Zadeh, L.A. (1965), Fuzzy Sets ; Information and Control, 8(3): 338–353.

Similar Articles

1-10 of 323

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)