Project scheduling to maximize the net present va lue of the cash flows has been a topic of recent research. These re searches assume that the duration of activities is known either with certitude or at least with some probability. However, in many applications the structure of the duration of activities is imprecise. In this paper, the project scheduling problem with discount ed cash flows under fuzzy environment is considered. The duration of activiti es are assumed triangular fuzzy numbers. The derived mathematical model is a multi- objective non-linear programming model and for solving it the Taylor exp ansion is used to transform the objective function to a linear form. To interpret t he fuzzy solution of the model, a procedure which can be used for other similar probl ems is proposed. Finally, an example is solved and the proposed procedure is app lied to interpret the fuzzy solutions.
References
[1]. Chanas, S., Kamburowski, J. (1981), The Use of Fuzzy Variables in PERT .
Fuzzy Sets Systems, 5(1):11_19;
[2]. Demeulemeester, E., Herroelen, W. (2002), Project Scheduling: A Research