Simultaneous lot-sizing and scheduling in a distributed flow shop has been considered in this paper. Number of factories is a parameter and it is not necessary to use all factories. Outsourcing is the other realistic assumption of this paper. In other words, the tradeoff between outsourcing and number of utilized factories is discussed in this paper. An exact formulation of the problem has been provided as a mixed integer program. To solve the problem, a heuristic has been developed.
References
[1] Wagner H.M., Within T.M. (1958), Dynamic Version of the Economic Lot
Size Model; Management Science. 5, pp. 89-96;
[2] Mohammadi M., Torabi S.A., Fatemi Ghomi S.M.T., Karimi B. (2010), A
New Algorithmic Approach for Capacitated Lot-Sizing Problem in Flow Shops
with Sequence-Dependent Setups; International Journal Advantages
Manufacturing Technology 49, pp. 201-211;
[3] Fandle G., Stammen-Hegene C. (2006), Simultaneous Lot-sizing and
Scheduling for Multi-product Multi-level Production; International Journal
Production Economy 104 (2), pp. 308-316;
[4] Karimi B., Fatemi Ghomi S.M.T., Wilson J.M. (2003), The Capacitated Lot
Sizing Problem: A Review of Models and Algorithms; Omega 31(5), pp. 365-378;
[5] Merece C., Fonton G. (2003), MIP-based Heuristics for Capacitated Lot-
sizing Problems; International Journal Production Economy 85(1), pp. 97-111;
[6] Zhu X., Wilelm W. E. (2006), Scheduling and Lot-sizing with Sequence-
dependent Setup: A Literature Review; IIE Trans 38, pp. 987-1007;