Using GRASP for Resource Availability Cost Problem with Time Dependent Resource Cost

Submitted
October 24, 2026

Abstract

In this paper, we consider the resource investment project scheduling problem of minimizing the total resource availability costs by a given project deadline subject to recruitmen t and release dates for resources with time dependent recruitment setup cost. The project contains activities interrelated by finish-start type precedence relations with a time lag of zero, which require a set of renewable resources. A mixed integer progra mming formulation is proposed for the problem. The problem formed in this way is an NP -hard one forcing us to use Greedy Randomized Adaptive Search Procedure (GRASP) algorithm to obtain a satisfying solution. The performance of the proposed algorithm is evaluated on 150 test problems by statistically comparing in term of the objective function and computational times. Comparative computational results reveal that the proposed algorithm is efficient and effective.

References

  1. [1] Agarwal, A., Colak, S., & Erenguc, S. (2011), A Neurogenetic
  2. Approach for the Resource-constrained Project Scheduling Problem;
  3. Computers and Operations Research, 38(1), pg.44-50;
  4. [2] Blazewicz, J., Lenstra, J., & Rinnooy Kan, A. (1983), Scheduling
  5. Subject to Resource Constraints: Classification and Complexity;
  6. Discrete Applied Mathematics, 5, pg.11-24;
  7. [3] Demeulemeester, E. (1995), Minimizing Resource Availability Costs
  8. in Time-limited Project Networks; Manag. Scien. 41, pg.1590-1598;
  9. [4] Drexl, A., & Kimms, A. (2001), Optimization Guided Lower and
  10. Upper Bounds for the Resource Investment Problem; Journal of
  11. Operations Research Society, 52, pg.340-351;
  12. [5] Fang, C., & Wang, L. (2012), An Effective Shuffled Frog-leaping
  13. Algorithm for Resource-constrained Project Scheduling Problem;
  14. Computers and Operations Research, 39(5), pg.890-901;
  15. [6] Feo, T. A., & Resende, M. G. C. (1995), Greedy Randomized
  16. Adaptive Search Procedures; Journal of Global Optimization, 6,
  17. pg.109-133;
  18. [7] Hartmann, S., & Briskorn, D. A. (2010), Survey of Variants and
  19. Extensions of the Resource-constrained Project Scheduling
  20. Problem; European J.of Operational Research, 207(1), pg.1-14;
  21. [8] Hartmann, S., & Kolisch, R. (2000), Experimental Evaluation of
  22. State-of-the-art Heuristics for the Resource-constrained Project
  23. Scheduling Problem; European Journal of Operational Research,
  24. 127, pg.394-407;
  25. [9] Hartmann, S., & Kolisch, R. (2006), Experimental Investigation of
  26. Heuristics for Resource-constrained Project Scheduling: An update;
  27. European Journal of Operational Research, 17, pg.23-37;
  28. [10] Jairo, R., Torres, M., & Edgar, G. F., Carolina Pirachicán-
  29. Mayorga (2010), Project Scheduling with Limited Resources using
  30. a Genetic Algorithm; International Journal of Project Management,
  31. 28(6): pg.619-628;
  32. [11] Kolisch, R., & Hartmann, S. (1998), Heuristic Algorithms for the
  33. Resource-constrained Project Scheduling Problem: Classification
  34. and Computational Analysis. In: Weglarz, J. (Ed.), Project
  35. Scheduling: Recent Models, Algorithms and Applications; Kluwer
  36. Academic Publishers, pg.147-178;
  37. [12] Kolisch, R., Sprecher, A., & Drexl, A. (1995), Characterization and
  38. Generation of a General Class of Resource-constrained Project
  39. Scheduling Problems; Management Science, 41, pg.1693-1703;
  40. [13] Koné, O. (2012), New Approaches for Solving the Resource-
  41. constrained Project Scheduling Problem; 4OR; 10(1), pg.105-106;
  42. [14] Möhring, R. F. (1984), Minimizing Costs of Resource Requirements
  43. in Project Networks Subject to a Fixed Completion Time; Operations
  44. Research, 32, pg.89-120;
  45. Using GRASP for resource availability cost problem with time dependent …
  46. __________________________________________________________________
  47. [15] Najafi, A. A., & Niaki, S. T. A. (2006), A Genetic Algorithm for
  48. Resource Investment Problem with Discounted Cash Flows; Applied
  49. Mathematics and Computations, 183, pg.1057-70;
  50. [16] Najafi, A. A., Niaki, S. T. A., & Shahsavar, M. A. (2009),
  51. Parameter-tuned Genetic Algorithm for the Resource Investment
  52. Problem with Discounted Cash Flows and Generalized Precedence
  53. Relations; Computers and Operations Research,36, pg.2994-3001;
  54. [17] Paraskevopoulos, D. C., Tarantilis, C. D., & Ioannou, G. (2012),
  55. Solving Project Scheduling Problems with Resource Constraints via
  56. an Event List-based Evolutionary Algorithm; Expert Systems with
  57. Applications, 39(4), pg.3983-3994;
  58. [18] Pitsoulis, L. S., & Resende, M. G. C. (2002), Greedy Randomized
  59. Adaptive Search Procedure; In Handbook of Applied Optimization, P.
  60. Pardalos and M. Resende, Eds. Oxford University Press, pg.168-183;
  61. [19] Pritsker, A. A. B., Watters, L. J., & Wolfe, P. M. (1969), Multi
  62. Project Scheduling with Limited Resources; Management Science,
  63. 16, pg.93-108;
  64. [20] Rangaswamy, B. (1998), Multiple Resource Planning and
  65. Allocation in Resource-Constrained Project Networks; Ph.D. Thesis,
  66. Graduate School of Business, University of Colorado.
  67. [21] Ranjbar, M., Kianfar, F., & Shadrokh, S. (2008), Solving the
  68. Resource Availability Cost Problem in Project Scheduling by Path
  69. Relinking and Genetic Algorithm; Applied Mathematics and
  70. Computations, 196, pg.879-888;
  71. [22] Rodrigues, S., & Yamashita, D. (2010), An Exact Algorithm for
  72. Minimizing Resource Availability Costs in Project Scheduling;
  73. European Journal of Operational Research, 206, pg.562-568;
  74. [23] Schwindt, C. (1996), Generation of Resource Constrained
  75. Scheduling Problems with Minimal and Maximal Time Lags; Report
  76. WIOR-489, Universitat Karlsruhe;
  77. [24] Shadrokh, S., & Kianfar, F. (2007), A Genetic Algorithm for
  78. Resource Investment Project Scheduling Problem, Tardiness
  79. Permitted with Penalty; European Journal of Operational Research,
  80. 181, pg.86-101;
  81. [25] Van Peteghem, V., & Vanhoucke, M. (2011), An Artificial Immune
  82. System Algorithm for the Resource Availability Cost Problem;
  83. Flexible Service Manufacturing Journal, DOI 10.1007/s10696-011-
  84. 9117-0;
  85. [26] Yamashita, D., Armentano, V., & Laguna, M. (2006), Scatter
  86. search for Project Scheduling with Resource Availability cost;
  87. European Journal of Operational Research, 169, pg.623-637;
  88. [27] Zhang, H., Li, H., & Tam, C. M. (2006), Particle Swarm
  89. Optimization for Resource-constrained Project Scheduling;
  90. International Journal of Project Management, 24(1), pg.83-92.

Similar Articles

1-10 of 260

You may also start an advanced similarity search for this article.