Earned Value Analysis Approach by Extending New Key Performance Indicators in a New Framework under a Grey Environment

DOI:
https://doi.org/10.24818/18423264/53.3.19.08
Submitted
October 24, 2026

Abstract

An inseparable part of project management is the existence of uncertainty. There are various methodologies and tools to handle the impact of uncertainty on project performance. Todenote the uncertainty, we use grey theory because ofits accuracy and conv enience in modeling uncertainty. In this paper, a new grey -based earned value technique with a new extended set of key performance indicators ( KPIs)is proposed to measure the progress, performance, cost and time estimate at completion of the construction projects under uncertainty circumstances. A new formulation of cos t and time estimation at completion is introduced that is based on using a newly developed weighting method called W- TODIM. The proposed model improves managing different aspects of a project through a flexible and intelligent approach. Finally, a case stu dy of construction project from the literature is presented to show the efficiency of presented model.

References

  1. [1] Anantatmula, V. S. & Fan, Y. (2018),Risk Management Strategies for
  2. Project Success.In Research, Practices, and Innovations in Global Risk
  3. and Contingency Management. IGI Global, 250-267;
  4. [2] Bai, C. &Sarkis, J. (2013),A Grey-based DEMATEL Model for
  5. Evaluating Business Process Management Critical Success
  6. Factors.International Journal of Production Economics 146(1), 281-292;
  7. [3] Banihashemi, S., Hosseini, M. R., Golizadeh, H. &Sankaran, S.
  8. (2017),Critical Success Factors (Csfs) for Integration of Sustainability
  9. into Construction Project Management Practices in Developing
  10. Countries.International Journal of Project Management 35(6), 1103-
  11. 1119;
  12. [4] Bhattacharyya, R. (2015),A Grey Theory Based Multiple Attribute
  13. Approach for R&D Project Portfolio Selection.Fuzzy Information and
  14. Engineering 7(2), 211-225;
  15. Earned Value Analysis Approach by Extending New Key Performance
  16. Indicators in a New Framework under a Grey Environment
  17. __________________________________________________________________
  18. 149
  19. DOI: 10.24818/18423264/53.3.19.08
  20. [5] Ekhtiari, M., Yadegari, E. &Sadidi, G. (2016),Ranking
  21. Entrepreneurship Main Risks in Non-Profit Financial Funds by
  22. TODIM Technique under Grey Condition (A Case Study in
  23. Iran).Economic Computation & Economic Cybernetics Studies &
  24. Research, 50(3), 319-336, ASE Publishing;
  25. [6] Gomes, L. F. A. M. & Lima, M. M. P. P. (1992),TODIM: Basics and
  26. Application to Multicriteria Ranking of Projects with Environmental
  27. Impacts. Foundations of Computing and Decision Sciences 16(4), 113-
  28. 127;
  29. [7] Kerzner, H. (2017), Project Management Metrics, Kpis, and
  30. Dashboards: A Guide to Measuring and Monitoring Project
  31. Performance. John Wiley & Sons;
  32. [8] Lin, Y., Chen, M. Y. & Liu, S. (2004),Theory of Grey Systems:
  33. Capturing Uncertainties of Grey Information.Kybernetes 33(2), 196-218;
  34. [9] Liu, H. T. & Cheng, H. S. (2016),An Improved Grey Quality Function
  35. Deployment Approach Using the Grey TRIZ Technique.Computers &
  36. Industrial Engineering 92, 57-71;
  37. [10] Noori, S., Bagherpour, M. &Zareei, A. (2008),Applying Fuzzy Control
  38. Chart in Earned Value Analysis: A New Application.World Applied
  39. Sciences Journal 3(4), 684-690;
  40. [11] Parmenter, D. (2015), Key Performance Indicators: Developing,
  41. Implementing, and Using Winning Kpis. John Wiley & Sons;
  42. [12] PMI (2013), A Guide to the Project Management Body of Knowledge
  43. (PMBOK Guide). Fifth edition. Project Management Institute;
  44. [13] Rahimnia, F., Moghadasian, M., &Mashreghi, E. (2011),Application of
  45. Grey Theory Approach to Evaluation of Organizational Vision.Grey
  46. Systems: Theory and Application 1(1), 33-46;
  47. [14] RazaviHajiagha, S. H., Akrami, H., Hashemi, S. S. &Mahdiraji, H. A.
  48. (2015),An Integer Grey Goal Programming for Project Time, Cost and
  49. Quality Trade-Off. Engineering Economics 26(1), 93-100;
  50. [15] Rostami, A, Sommerville, J, Wong, I.L, Lee, C. (2015), Risk
  51. Management Implementation in Small and Medium Enterprises in the
  52. UK Construction Industry.Engineering, Construction and Architectural
  53. Management 22(1): 91-107;
  54. Amin Eshghi, Seyed M. Mousavi, Jurgita Antucheviciene, Vahid Mohagheghi
  55. __________________________________________________________________
  56. 150
  57. DOI: 10.24818/18423264/53.3.19.08
  58. [16] Salari, M., Bagherpour, M. & Wang, J. (2014),A Novel Earned Value
  59. Management Model Using Z-Number.International Journal of Applied
  60. Decision Sciences 7(1), 97-119;
  61. [17] Simion, C. P. & Marin, I. (2018),Project Cost Estimate at Completion:
  62. Earned Value Management versus Earned Schedule-based Regression
  63. Models. A Comparative Analysis of the Models Application in the
  64. Construction Projects in Romania.Economic Computation & Economic
  65. Cybernetics Studies & Research 52(3), 215-216, ASE Publishing;
  66. [18] Slavek, N. &Jović, A. (2012), Application of Grey System Theory to
  67. Software Projects Ranking. Automatika: časopiszaautomatiku, mjerenje,
  68. elektroniku, računarstvoikomunikacije, 53(3), 284-293;
  69. [19] Taillandier, F, Taillandier, P, Tepeli, E, Breysse, D, Mehdizadeh, R,
  70. Khartabil, F. (2015), A Multi-agent Model to Manage Risks in
  71. Construction Project (SMACC).Automation in Construction, 58, 1-18;

Similar Articles

1-10 of 925

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)