Project Cost Estimate at Completion: Earned Value Management versus Earned Schedule-Based Regression Models. A Comparative Analysis of the Models Application in the Construction Projects in Romania

DOI:
https://doi.org/10.24818/18423264/52.3.18.14
Submitted
October 24, 2026

Abstract

This paper explores the application of CEAC (Cost Estimate at Completion) calculation models for construction projects in Romania. Four models based on Earned Value Management, a GGM (Gompertz Growth) based model, and an E arned Schedule GGM based model were selected. Based on the data analyzed for 30 projects, the percentage error was determined to apply the four EVM models and the two GGMs based on each project. Percentage error for applying ES GGM based models was lower than for EVM models (C ost Performance Index , C omposite Index , C ritical Ratio , M oving Average ). The accuracy and precision of ES -GGM based models have proven superior in all project life cycles compared to EVM models.

References

  1. [1]Ahiaga-Dagbui, D. D., Love, P. E. D., Smith, S., Ackermann, F. (2017),
  2. Toward a Systemic View to Cost Overrun Causation in Infrastructure Projects:
  3. A Review and Implications for Research. Project Management Journal, 48(2),
  4. 88–98;
  5. [2]Cantarelli, C., Flyvbjerg, B., Molin, E. J. & van Wee, B. (2010), Cost
  6. Overruns in Large-Scale Transportation Infrastructure Projects: Explanations
  7. and their Theoretical Embeddedness. European Journal of Transport
  8. Infrastructure Research, 10(1), 5–18;
  9. [3]De Marco, A., Rosso, M., Narbaev, T. (2016b), Nonlinear Cost Estimates at
  10. Completion Adjusted with Risk Contingency. Journal of Modern Project
  11. Management, 4(2), 24-33;
  12. [4]Fleming, Q.W., Koppelman, J.M. (2006), Earned Value Project
  13. Management, third ed. Project Management Institute, Inc., Newtown Square, PA;
  14. [5]Ishii, N., Takano, Y. & Muraki, M. (2014), An Order Acceptance Strategy
  15. under Limited Engineering Man-hours for Cost Estimation in Engineering–
  16. Procurement–Construction Projects ;International Journal of Project
  17. Management 32, 519–528;
  18. [6]Jørgensen, M., Halkjelsvik, T. &Kitchenham, B.(2012), How Does Project
  19. Size Affect Cost Estimation Error? Statistical Artifacts and Methodological
  20. Challenges ; International Journal of Project Management 30, 839–849;
  21. [7] Kim, B.C., Reinschmidt, K.F. (2011), Combination of Project Cost Forecasts
  22. in Earned Value Management. Journal of Construction Engineering and
  23. Management137 (11), 958–966;
  24. [8] Lipke, W. (2004), Independent Estimates at Completion: Another Method.
  25. Crosstalk. J. Def. Softw. Eng. 26–30 (October);
  26. [9]Lipke, W. (2003), Schedule is Different . The Measurable News. 31–34
  27. (Summer);
  28. [10]Love, P. E. D., Smith, J., Simpson, I., Regan, M. &Olatunji,O.(2015),
  29. Understanding the Landscape of Overruns in Transport Infrastructure
  30. Projects. Environment and Planning B: Planning and Design, 42(3);
  31. [11]Narbaev, T., De Marco, A. (2014), Combination of Growth Model and
  32. Earned Schedule to Forecast Project Cost at Completion. Journal of Construction
  33. Engineering and Management. 140 (1);
  34. [12]Narbaev, T., De Marco, A. (2014), An Earned Schedule Based Regression
  35. Model to Improve Cost Estimate at Completion. International Journal of Project
  36. Management., 32(6), 1007-1018;
  37. [13]PMI (2011), Practice Standard for Earned Value Management, second ed.
  38. Project Management Institute, Inc., Newtown Square, PA;
  39. Cezar-Petre Simion, Irinel Marin
  40. ____________________________________________________________
  41. DOI: 10.24818/18423264/52.3.18.14
  42. 216
  43. [14]Seber, G.A., Wild, C.J. (1989), Nonlinear Regression. John Wiley & Sons;
  44. New York, NY;
  45. [15]Simion-Melinte C.(2016), Factors Influencing the Choice of Cost Estimates
  46. Types and the Accuracy of Estimates for Construction Projects. Proceedings of
  47. the 10th International Management Conference, "Challenges of Modern
  48. Management", November 3rd-4th,2016, 50-56;
  49. [16]Vandevoorde, S., Vanhoucke, M. (2006), A Comparison of Different Project
  50. Duration Forecasting Methods Using Earned Value Metrics. International
  51. Journal of Project Management,24 (4), 289–302;
  52. [17]Yokum, J.T., Armstrong, J.S. (1995), Beyond Accuracy: Comparison of
  53. Criteria Used to Select Forecasting Methods .Int. J. Forecast. 11 (4), 591–597.

Similar Articles

1-10 of 836

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)