Redevelopment of derelict buildings is examined fro m the aspects of sustainable development and a lot of con flicting criteria are involved. Fuzzified MCDM (multiple criteria decision making) methods, i.e. TOPSIS-F (the Technique for Order Preference by Similarity to Ideal Solution) based on vector as well as linear normalization of initial criteria va lues, COPRAS-F (a method of multiple criteria COmplex PRoportional ASsessment o f projects), and VIKOR-F (VlseKriterijumska Optimizacija I Kompromisno Resen je in Serbian) are applied for evaluating the rational use of buildings. A met hodology for measuring the objective congruence (incongruence) of the ranking results of different MCDM methods as well as criteria of consistency (inconsi stency) of ranking results are developed and applied for a particular case study of Lithuania.
References
[1] Аivazian, S. А.; Мkhitarian, V. S. (1998), Applied Statistics and
Essentials of Econometrics . Моsсow, Junity;
[2] Amiri, M. P. (2010), Project Selection for Oil-fields Development by Using
the AHP and Fuzzy TOPSIS Methods. Expert Systems with Applications
37(9), 6218–6224;
[3] Antucheviciene, J. (2003), Principles of Revitalization of Derelict Rural
Buildings. Journal of Civil Engineering and Management 9(4), 225–233;
[4] Antucheviciene, J., Zavadskas, E. K. (2008), Modelling
Multidimensional Redevelopment of Derelict Buildings. International
Journal of Environment and Pollution 35(2/3/4), 331–344;
[5] Antucheviciene, J., Zavadskas, E. K., Zakarevicius, A. (2010), Multiple
Criteria Construction Management Decisions Considering Relations
between Criteria . Technological and Economic Development of Economy
16(1), 109–125;
[6] Antucheviciene, J., Zakarevicius, A.; Zavadskas, E. K. (2011),
Measuring Congruence of Ranking Results Applying Particular MCDM
Methods . Informatica 22(3), 319–338;
[7] Badescu, A., Smeureanu, I., Cristea, R., Asimit, A. V. (2010), Portfolio
Assets Selection through Grey Numbers Implementation. Economic
Computation and Economic Cybernetics Studies and Research 4, 23–36.
[8] Baležentis, A., Baležentis, T. (2011), An Innovative Multi-criteria Supplier
Selection Based on Two-tuple MULTIMOORA and Hybrid Data.
Economic Computation and Economic Cybernetics Studies and Research
45(2), 37–56;
[9] Banaitiene, N., Banaitis, A., Kaklauskas, A., Zavadskas, E. K. (2008),
Evaluating the Life Cycle of a Building: A Multivariant and Multiple
Criteria Approach . Omega : the international journal of management
science 36(3), 429–441;
[10] Behret, H., Kahraman, C. (2010), A Multi-Period Newsvendor Problem
with Pre-Season Extension under Fuzzy Demand . Journal of Business
Economics and Management 11(4), 613–629;
[11] Bindu Madhuri, Ch., Anand Chandulal, J., Padmaja, M. (2010),
Selection of Best Web site by Applying COPRAS-G Method. International
Journal of Computer Science and Information Technologies 1(2), 138-146;
[12] Bindu Madhuri, Ch., Anand Chandulal, J. (2010), Evaluating web
sites Using COPRAS-GRA Combined with Grey Clustering. International
Journal of Engineering Science and Technology 2(10), 5280-5294;
[13] Boran, F. E., Genç, S., Kurt, M., Akay, D. (2009), A Multi-criteria
Intuitionistic Fuzzy Group Decision Making for Supplier Selection with
TOPSIS Method. Expert Systems with Applications 36(8), 11363–11368;
J. Antucheviciene, E. K. Zavadskas, A. Zakarevicius