Using Vibration Damping Optimization Algorithm for Resource Constraint Project Scheduling Problem with Weighted Earliness-Tardiness Penalties and Interval Due Dates
Resource constrained project scheduling problem with weighted earliness-tardiness penalties is one of the most crucial problems in resource constrained project scheduling problems. This paper focuses on the notable characteristic of the model which is an interval due dates for activities. In this problem setting, act ivities have an interval activity due date with associated unit earliness and tardiness penalties. Vibration damping optimization (VDO) is proposed to solve this strongly NP -hard model. The proposed VDO algorithm is computationally compared with simulated annealing (SA) algorithm and the results are analyzed and discussed. Response surface methodology (RSM) is employed to tune of the VDO and SA parameters.
References
[1] Afshar-Nadjafi, B. and Shadrok, Sh. (2008), An Algorithm for the