The Tradeoff between Outsourcing and Using More Factories in a Distributed Flow Shop System

Submitted
October 24, 2026

Abstract

Simultaneous lot-sizing and scheduling in a distributed flow shop has been considered in this paper. Number of factories is a parameter and it is not necessary to use all factories. Outsourcing is the other realistic assumption of this paper. In other words, the tradeoff between outsourcing and number of utilized factories is discussed in this paper. An exact formulation of the problem has been provided as a mixed integer program. To solve the problem, a heuristic has been developed.

References

  1. [1] Wagner H.M., Within T.M. (1958), Dynamic Version of the Economic Lot
  2. Size Model; Management Science. 5, pp. 89-96;
  3. [2] Mohammadi M., Torabi S.A., Fatemi Ghomi S.M.T., Karimi B. (2010), A
  4. New Algorithmic Approach for Capacitated Lot-Sizing Problem in Flow Shops
  5. with Sequence-Dependent Setups; International Journal Advantages
  6. Manufacturing Technology 49, pp. 201-211;
  7. [3] Fandle G., Stammen-Hegene C. (2006), Simultaneous Lot-sizing and
  8. Scheduling for Multi-product Multi-level Production; International Journal
  9. Production Economy 104 (2), pp. 308-316;
  10. [4] Karimi B., Fatemi Ghomi S.M.T., Wilson J.M. (2003), The Capacitated Lot
  11. Sizing Problem: A Review of Models and Algorithms; Omega 31(5), pp. 365-378;
  12. [5] Merece C., Fonton G. (2003), MIP-based Heuristics for Capacitated Lot-
  13. sizing Problems; International Journal Production Economy 85(1), pp. 97-111;
  14. [6] Zhu X., Wilelm W. E. (2006), Scheduling and Lot-sizing with Sequence-
  15. dependent Setup: A Literature Review; IIE Trans 38, pp. 987-1007;
  16. [7] Mohammadi M., Fatemi Ghomi S.M.T., Karimi B., Torabi S.A. (2010),
  17. MIP-based Heuristics for Lot-sizing in Capacitated Pure Flow Shop with
  18. Sequence-dependent Setups; International Journal Production Research 48(10),
  19. pp. 2957-2973;
  20. [8] Mohammadi M., Fatemi Ghomi S.M.T., Karimi B., Torabi S.A. (2010),
  21. Rolling-horizon and Fix-and-relax Heuristics for the Multi-product Multi-level
  22. Capacitated Lot-sizing Problem with Sequence-dependent Setups; International
  23. Journal Manufacturing 21, pp. 501-510;
  24. [9] Mohammadi M., Fatemi Ghomi S.M.T. (2011), Genetic Algorithm-based
  25. Heuristic for Capacitated Lot-sizing Problem in Flow Shops with Sequence-
  26. dependent Setups; Expert System Appl 38, pp. 7201-7207;
  27. [10] Naderi B., Ruiz R. (2010), The Distributed Permutation Flow Shop
  28. Scheduling Problem; Computer Operation Research 37(4), pp. 754-768;
  29. [11] Moon C., Kim J., Hur S. (2002), Integrated Process Planning and
  30. Scheduling with Minimizing Total Tardiness in Multi-plants Supply Chain;
  31. Computer & Industrial Engineering 43 (1-2), pp. 331-349;
  32. [12] Almada-Lobo B., Klabjan D., Carravilla M.A., Oliviera J. (2007), Single
  33. Machine Multi-product Capacitated Lot-sizing with Sequence-Dependent
  34. Setups; International Journal Production Research 45(20), pp. 4873-4894;
  35. [13] Araujo S.A., Arenales M.N., Clark A.R. (2007), Joint Rolling-horizon
  36. Scheduling of Materials Processing and Lot-sizing with Sequence-dependent
  37. Setups; Journal Heuristics 13(4), pp. 337-358;
  38. [14] Araujo S.A., Arenales M.N., Clark A.R. (2008), Lot-sizing and Furnace
  39. Scheduling in Small Foundries; Computer Operation Research 35(3), pp. 916-
  40. 932;
  41. The Tradeoff between Outsourcing and Using More Factories in a Distributed
  42. Flow Shop System
  43. _______________________________________________________________
  44. 295
  45. [15] Beraldi P., Ghiani G., Grieco A., Guerriero E. (2008), Rolling-horizon and
  46. Fix-and-relax Heuristics for the Parallel Machine Lot-sizing and Scheduling
  47. Problem with Sequence-dependent Setup Costs; Computer Operation Research
  48. 35(11), pp. 3644-3656;
  49. [16] Clark A.R. (2003), Optimization Approximations for Capacity Constrained
  50. Material Requirements Planning; International Journal Production Economy
  51. 84(2), pp. 115-131;
  52. [17] Clark A.R., Clark S.J. (2000), Rolling-horizon Lot-sizing when Setup
  53. Times are Sequence-dependent; International Journal Production Research 38(10),
  54. pp. 2287-2308;
  55. [18] Chung. D. and Choi. B. (2013), Outsourcing and Scheduling for two-
  56. Machine Ordered Flow Shop Scheduling Problems; European Journal of
  57. Operational Research 226, pp. 46–52;
  58. [19] Sukkerd. W., Wuttipornpun. T. (2016), Hybrid Genetic Algorithm and
  59. Tabu Search for Finite Capacity Material Requirement Planning System in
  60. Flexible Flow Shop with Assembly Operations; Computers & Industrial
  61. Engineering 97, pp. 157–169;
  62. [20] Zandieh M, Rashidi. E (2009), An Effective Hybrid Genetic Algorithm for
  63. Hybrid Flow Shops with Sequence Dependent Setup Times and Processor
  64. Blocking; Journal of Industrial Engineering 4, pp. 51- 58;
  65. [21] Azab. A., Naderi. B. (2014), Greedy Heuristics for Distributed Job Shop
  66. Problems; 2nd ICRM 2014 International Conference on Ramp-Up Management,
  67. DOI:10.1016/j.procir.2014.05.025;
  68. [22] Costa. A., Cappadonna. F. A., Fichera. S. (2015), A Hybrid Genetic
  69. Algorithm for Minimizing Makespan in a Flow-Shop Sequence-dependent
  70. Group Scheduling Problem; Journal of Intelligent Manufacturing, pp. 1–15,
  71. DOI:10.1007/s10845-015-1049-1;
  72. [23] Jans R., Degraeve Z. (2007), Meta-heuristics for Dynamic Lot-sizing: A
  73. Review and Comparison of Solution Approaches; European Journal Operation
  74. Research 177(3), pp. 1851-1875;
  75. [24] Defersha F.M., Chen M. (2008), A Linear Programming Embedded Genetic
  76. Algorithm for an Integrated Cell Formation and Lot-Sizing Considering Product
  77. Quality; European Journal Operation Research 187(1), pp. 46-69.

Similar Articles

1-10 of 239

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)