Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 57 No. 4 (2023): ECECSR

Using Trend Modelling to Support Project Scheduling, Management and Prediction

Submitted
October 24, 2026

Abstract

Project management is implemented as a finite sequence of diverse decisions. Every decision -making is based on information. The broad spectrum of information contains various types of data. Data having an exact representation, e.g. phenomena described by e quations. Data that cannot have such a representation, e.g. experience, intuition, feelings. Such trend modelling allows us to work with this type of data. The article deals with the use of trend modelling as a support for project management and prediction under uncertainty. The solution of a trend model is a set of scenarios. These scenarios represent possible project states. A multi-criteria trend decision process allows one to identify the optimal project state(s). Based on the set of scenarios, a transition graph can be created, which can be used to determine all possible paths to get to this optimal state. The application of trend modelling is shown in a model of a project based on a six-pointed star.

References

  1. [1] Chan, A.P.C., Scott, D., Lam, E.W.M. (2002), Framework of success criteria
  2. for design/build projects. Journal of Management in Engineering, 18(3), 120–
  3. 128, https://doi.org/10.1061/(ASCE)0742-597X(2002)18:3(120);
  4. [2] Dohnal, M., Doubravsky, K. (2015), Qualitative Upper and Lower
  5. Approximations of Complex Nonlinear Chaotic and Nonchaotic Models.
  6. International Journal of Bifurcation and Chaos , 25(13), 1550173 ,
  7. https://doi.org/10.1142/S0218127415501734;
  8. [3] Ebbesen, J., Hope, A. (2013), Re-imagining the Iron Triangle: Embedding
  9. Sustainability into Project Constraints. PM World Journal, II;
  10. [4] Gerhards, P. (2020), The multi -mode resource investment problem:
  11. A benchmark library and a computational study of lower and upper bounds.
  12. Or Spectrum, 42(4), 901–933, https://doi.org/10.1007/s00291-020-00595-9;
  13. [5] Hans, E.W., Herroelen, W., Leus, R., W ullink, G. (2007), A hierarchical
  14. approach to multi -project planning under uncertainty. Omega, 35(5), 563 –
  15. 577, https://doi.org/10.1016/j.omega.2005.10.004;
  16. [6] Haughey, D. (2021), Introduction to Project Management. Project Smart.
  17. https://www.projectsmart.co.uk/lifecycle-and-methodology/introduction-to-
  18. project-management.php;
  19. Using Trend Modelling to Support Project Scheduling, Management, and Prediction
  20. 89
  21. [7] Kazemzadeh, M.B. (2010), Psychic systems and metaphysical machines:
  22. Experiencing behavioural prediction with neural networks. Technoetic Arts,
  23. 8(2), 189–198, https://doi.org/10.1386/tear.8.2.189_1;
  24. [8] Korotkov, V., Wu, D. (2021), Benchmarking project portfolios using
  25. optimality thresholds. Omega, 99, 102166,
  26. https://doi.org/10.1016/j.omega.2019.102166;
  27. [9] Lacko, B. (2004), The risk analysis of soft computing projects. Second
  28. International Conference on Soft Computing Applied in Computer and
  29. Economic Environments, 163–170;
  30. [10] Nonaka, I. (2008), The Knowledge -Creating Company . Harvard Business
  31. Review Press;
  32. [11] Project Management Institute. (2017), PMBOK Guide – Sixth Edition ,
  33. https://www.pmi.org/pmbok-guide-standards/foundational/pmbok/sixth-
  34. edition;
  35. [12] Schwalbe, K. (2015), Information Technology Project Management .
  36. Cengage Learning;
  37. [13] Stock, G.N., Tsai, J.C. -A., Jiang, J.J., Klein, G. (2021), Coping with
  38. uncertainty: Knowledge sharing in new product development projects.
  39. International Journal of Project Management , 39(1), 59 –70,
  40. https://doi.org/10.1016/j.ijproman.2020.10.001;
  41. [14] Turner, R.J., Huemann, M., Anbari, F.T., Bredillet, C h.N. (2010),
  42. Perspectives on Projects. Routledge;
  43. [15] Vanhoucke, M. (2014), Integrated Project Management and Control: First
  44. Comes the Theory, then the Practice. Springer;
  45. [16] Verbeeck, C., Van Peteghem, V., Vanhoucke, M., Vansteenwegen, P.,
  46. Aghezzaf, E.H. (2017), A metaheuristic solution approach for the time -
  47. constrained project scheduling problem. Or Spectrum , 39(2), 353 –371,
  48. https://doi.org/10.1007/s00291-016-0458-7;
  49. [17] Volner, R. (2016), Project Management and Air Transport. Journal of Trend
  50. in Research and Development, 3, 534–537;
  51. [18] Wang, Z., Danish, Zhang, B., Wang, B. (2018), Renewable energy
  52. consumption, economic growth and human development index in Pakistan:
  53. Evidence form simultaneous equation model. Journal of Cleaner Production,
  54. 184, 1081–1090, https://doi.org/10.1016/j.jclepro.2018.02.260;
  55. [19] Watermeyer, K., Zimmermann, J. (2020), A branch-and-bound procedure
  56. for the resource -constrained project scheduling problem with partially
  57. renewable resources and general temporal constraints. Or Spectrum, 42(2),
  58. 427–460, https://doi.org/10.1007/s00291-020-00583-z;
  59. Radek Doskočil, Karel Doubravský
  60. 90
  61. [20] Wethyavivorn, P., Teerajetgul, W. (2020), Tacit Knowledge Capture in Thai
  62. Design and Consulting Firms. Journal of Construction in Developing
  63. Countries, 25(1), 45–62, https://doi.org/10.21315/jcdc2020.25.1.3;
  64. [21] Wu, K.J., Gao, S., Xia, L., Tseng, M.L., Chiu, A.S.F., Zhang, Z. (2019),
  65. Enhancing corporate knowledge management and sustainable development:
  66. An inter -dependent hierarchical structure under linguistic preferences.
  67. Resources, Conservation and Recycling , 146, 560 –579, Scopus,
  68. https://doi.org/10.1016/j.resconrec.2019.03.015;
  69. [22] Xue, Y., Deng, Y. (2021), Decision making under measure -based granular
  70. uncertainty with intuitionistic fuzzy sets. Applied Intelligence, 51(8), 6224 –
  71. 6233, https://doi.org/10.1007/s10489-021-02216-6;
  72. [23] Yang, Y., Kang, S. (2020), Common Sense-Based Reasoning Using External
  73. Knowledge for Question Answering. IEEE Access , 8, 227185 –227192,
  74. https://doi.org/10.1109/ACCESS.2020.3045762;
  75. [24] Zellner, M., Abbas, A.E., Budescu, D.V., G alstyan, A. (2021), A survey of
  76. human judgement and quantitative forecasting methods. Royal Society Open
  77. Science, 8(2), 201187, https://doi.org/10.1098/rsos.201187;
  78. [25] Zhu, G., Bard, J.R., Yu, G. (2007), A two-stage stochastic programming
  79. approach for project planning with uncertain activity durations. Journal of
  80. Scheduling, 10(3), 167–180, https://doi.org/10.1007/s10951-007-0008-x.

Similar Articles

11-20 of 795

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)