Preemptive Resource Leveling in Projects

Submitted
October 24, 2026

Abstract

As a well-known NP-hard problem in project scheduling, the resource leveling problem (RLP) has attracted many researchers’ attentions. In the RLP , a typical assumption is that activities are non-preemptive during project execution, which means that activities cannot be interrupted once they have been started. However, preemption is not uncommon in project management practice and existing studies already show that it is beneficial to consider preemption when leveling resource usage. Therefore, we investigate the preemptive resource leveling problem and design a genetic estimation of distribution algorithm (GEDA). To analyze the performance of the GEDA, we conduct extensively computational experiments on 2160 randomly generated instances. We also examine the impacts of various factors on the GEDA. Comparative experimental results show that the GEDA outperforms the existing meta-heuristic algorithm.

References

  1. [1] Alsayegh, H. & Hariga, M. (2012), Hybrid Meta-heuristic Methods for the
  2. Multi-resource Leveling Problem with Activity Splitting. Automation in
  3. Construction, 27(1), 89-98;
  4. [2] Ballestín, F., Valls, V . & Quintanilla, S. (2008), Pre-Emption in
  5. Resource-constrained Project Scheduling. European Journal of Operational
  6. Research, 189(3), 1136-1152;
  7. [3] Ballestín, F. Valls, V . & Quintanilla, S. (2009), Scheduling Projects with Limited
  8. Number of Preemptions. Computers & Operations Research, 36(11), 2913-2925;
  9. [4] Bock, D. B. & Patterson, J. H. (1990), A Comparison of Due Date Setting,
  10. Resource Assignment, and Job Preemption Heuristics for the Multiproject
  11. Scheduling Problem. Decision Sciences, 21(2), 387-402;
  12. Hongbo Li, Ziyi Hu, Hanyu Zhu, Yinbin Liu
  13. 68
  14. [5] Demeulemeester, E. L. & Herroelen, W. S. (1996), An Efficient Optimal
  15. Solution Procedure for the Preemptive Resource-constrained Project
  16. Scheduling Problem. European Journal of Operational Research, 90(2), 334-348;
  17. [6] Doulabi, S., Seifi, A. & Shariat, S. Y. (2011), Efficient Hybrid Genetic Algorithm
  18. for Resource Leveling via Activity Splitting. Journal of Construction Engineering
  19. and Management, 137(2), 137-146;
  20. [7] Forghani, K. & Fatemi-Ghomi, S. T. (2019), Cellular Manufacturing
  21. Scheduling in the Presence of Multiple Process Routings and Considering Job
  22. Splitting. Economic Computation and Economic Cybernetics Studies and
  23. Research, 53(2), 271-288; ASE Publishing;
  24. [8] Hariga, M. & El-Sayegh, S. M. (2011), Cost Optimization Model for the
  25. Multi-resource Leveling Problem with Allowed Activity Splitting. Journal of
  26. Construction Engineering and Management, 137(1), 56-64;
  27. [9] Li, H. & Dong, X. (2018), Multi-mode Resource Leveling in Projects with
  28. Mode-dependent Generalized Precedence Relations. Expert Systems with
  29. Applications, 97, 193-204;
  30. [10] Li, H., Xiong, L., Liu, Y., & Li, H. (2018), An Effective Genetic Algorithm for
  31. the Resource Leveling Problem with Generalised Precedence Relations.
  32. International Journal of Production Research, 56(5), 2054-2075;
  33. [11] Liu, Y., Hu, Z., Li, H. & Zhu, H. (2019), Does Preemption Lead to More
  34. Leveled Resource Usage in Projects? A Computational Study Based on
  35. Mixed-Integer Linear Programming. Economic Computation and Economic
  36. Cybernetics Studies and Research, 53(4), 243-258; ASE Publishing;
  37. [12] Nadjafi, B., Khalaj, Z. & Mehdizadeh, E. (2013), A Branch and Bound
  38. Approach to Solve the Preemptive Resource Leveling Problem. International
  39. Journal of Manufacturing Engineering, (1), 24-26;
  40. [13] Neumann K., Schwindt C. & Zimmermann J. (2003), Project Scheduling with
  41. Time Windows and Scarce Resources: Temporal and Resource-constrained
  42. Project Scheduling with Regular and Nonregular Objective Functions.
  43. Springer;
  44. [14] Nudtasomboon, N. & Randhawa, S. U. (1997), Resource-constrained Project
  45. Scheduling with Renewable and Non-renewable Resources and Time-resource
  46. Tradeoffs. Computers & Industrial Engineering, 32(1), 227-242;
  47. [15] Razavi, N. & Mozayani, N. (2007), A Resource Leveling Model Based On
  48. Genetic Algorithms: Activity Splitting Allowed. Proceedings of the International
  49. MultiConference of Engineers and Computer Scientists 2007, IMECS 2007,
  50. March 21-23, 2007, Hong Kong, China. DBLP;
  51. [16] Rieck, J. & Gather, T. (2012), Mixed-integer Linear Programming for Resource
  52. Leveling Problems. European Journal of Operational Research, 221(1), 27-37;
  53. [17] Schwindt, C. (1995), ProGen/max:
  54. A New Problem Generator for Different
  55. Resource-constrained Project Scheduling Problems with Minimal and Maximal
  56. Time Lags. Institute for Economic Theory and Operations Research 449,
  57. Universitat Karlsruhe, Karlsruhe, Germany;
  58. [18] Son, J. & Mattila, K. G. (2004), Binary Resource Leveling Model: Activity
  59. Splitting Allowed. Journal of Construction Engineering and Management, 130(6),
  60. 887-894.

Similar Articles

1-10 of 272

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)