Skip to main navigation menu Skip to main content Skip to site footer

Articles

Vol. 55 No. 4 (2021)

Improved Ant Colony Optimization for Multi-Resource Job Shop Scheduling: A Special Case of Transportation

Submitted
October 24, 2026

Abstract

In this paper, we addressed the multi-resource job shop scheduling problem (MRJSP) with resour ce flexibility to minimize makespan. Regarding this issue, a mixed integer linear programming (MILP) model was developed. The minimization of makespan is a non-deterministic polynomial time optimization problem; hence, we implemented several improvements to the ant colony optimization (ACO) algorithm. To improve the algorithm, a new strategy inspired from selfish herd (SH) theory was used to update the pheromones in the algorithm. Scheduling WOs in a transportation workshop is similar to a job shop scheduling problem. Therefore, the structure of this special case was chosen to evaluate the new method. The proposed approach was evaluated in five test cases and numerical computational experiments. The performance of the improved ACO algorithm was compared in all test cases, including small and large test cases. The computational experiments show that the al gorithms modified with the SH strategy outperformed the same algorithms withou t this strategy. Mo reover, the results demonstrate the efficiency and capability of the proposed model and solution approach for optimizing the makespan of the problem.

References

  1. [1] Asadzadeh, L., Zamanifar, K. (2010), An Agent-Based Parallel Approach for the Job Shop Scheduling Problem with Genetic Algorithms; Mathematical and Computer Modelling, 52, pp. 1957_1965;
  2. [2] Artigues, L. Lopez, P. Ayache, P. D. (2005), Schedule Generation Schemes for the Job-Shop Problemwith Sequence-Dependent Setup Times: Dominance Properties and Computational Analysis; Annals of Operations Research,138, pp. 21–52;
  3. [3] Augusto, V., Xie, X., Perdomo, V. (2010), Operating Theatre Scheduling with Patient Recovery in both Operating Rooms and Recovery Beds; Computers & Industrial Engineering, Vol. 58(2), pp. 231–238;
  4. [4] Beck, J. C., T. Feng and J.-P. Watson (2011), Combining Constraint Programming and Local Search for Job-Shop Scheduling; INFORMS Journal on Computing, 23(1): 1-14;
  5. [5] Behmanesh, R. (2016), Nephron Algorithm Optimization : Inspired of the Biologic Nephron Performance; International Journal of Applied Metaheuristic computing, Vol. 7(1), pp. 38-64;
  6. [6] Behmanesh, R., Zandieh, M., & Hadji Molana, S. M. (2020), Multiple Resource Surgical Case Scheduling Problem: Ant Colony System Approach; Economic Computation & Economic Cybernetics Studies & Research, 54(1).;
  7. [7] Dorigo, M., Maniezzo, V., Colorni, A. (1991), Positive Feedback as a Search Strategy; Technical Report 91-016, Dip. Elettronica, Politecnico di Milano, Italy;
  8. [8] Ferland JA, Ichoua S, Lavoie A, Gagne E. (2001), Scheduling Using Tabu Search Methods with Intensification and Diversification; Computers & Operations Research, 28, pp.1075–1092;
  9. [9] Grimes, D. and E. Hebrard (2015), Solving Variants of the Job Shop Scheduling Problem through Conflict-Directed Search; INFORMS Journal on Computing, 27(2): 268-284;
  10. [10] Guo, Z.X. Wong, W.K, Leung,S.Y.S. Fan, J.T. Chan S.F. (2006), Mathematical Model and Genetic Optimization for the Job Shop Scheduling Problem in a Mixed- Andmulti-Product Assembly Environment: A Case Study Based on the Apparel Industry; Computers & Industrial Engineering, 50, pp. 202–219;
  11. [11] Hamilton, W.D. (1971), Geometery for Selfish Heard; J.theor.Biol, 31, pp. 295-311;
  12. [12] Heinonen, J., Pettersson, F., (2007), Hybrid Ant Colony Optimization and Visibility Studies Applied to a Job-Shop Scheduling Problem; Applied Mathematics and Computation, 187(2), pp. 989-998;
  13. [13] Huang R.H., Yang, C.L. (2008), Ant Colony System for Job Shop Schedulingwith Time Windows; Int J Adv Manuf Technol, 39, pp. 151–157; 294
  14. [14] Kundakci, N. Kulak, O. (2016), Hybrid Genetic Algorithms for Minimizing Makespan in Dynamic Job Shop Scheduling Problem; Computers & Industrial Engineering, 96, pp. 1–51;
  15. [15] Liu, S.Q. Kozan, E. (2016), Parallel-identical-machine Job-shop Scheduling with Different Stage-Dependent Buffering Requirements; Computers & Operations Research, 74,pp.31–41;
  16. [16] Mati, Y., Xiaolan Xie, X. (2008), A Genetic-Search-Guided Greedy Algorithm for Multi-Resource Shop Scheduling with Resource Flexibility; IIETransactions, Vol. 40(12), pp. 1228-1240;
  17. [17] Mati, Y. (2010), Minimizing the Makespan in the Non-Preemptive Job-Shop Schedulingwith Limited Machine Availability; Computers & Industrial Engineering, 59, pp. 537–543;
  18. [18] Pan, J. C. H., Huang. H. ch. (2009), A Hybrid Genetic Algorithm for No- Wait Job Shop Scheduling Problems; Expert Systems with Applications, 36, pp.5800–5806;
  19. [19] Pinedo, M. (2012), Scheduling: Theory, Algorithms, and Systems; Springer- Verlag, New York, 4th edition.
  20. [20] Salido, M.A.Joan, E. Barber, F. Giret, A. (2017), Rescheduling in Job- shop Problems for Sustainable Manufacturing Systems; Journal of Cleaner Production, 162, pp.121-132;
  21. [21] Tiwari, P.K., Vidyarthi, D.P., (2016), Improved Auto Control Ant Colony Optimization Using Lazy Ant Approach for Grid Scheduling Problem; Future Generation Computer Systems,Vol. 60, pp. 78-89;
  22. [22] Xiang, W., Yin, J., Lim, G. (2015), An Ant Colony Optimization Approach for Solving an Operating Room Surgery Scheduling Problem; Computers & Industrial Engineering, Vol. 85, pp. 335–345.

Similar Articles

11-20 of 1322

You may also start an advanced similarity search for this article.

Most read articles by the same author(s)